My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-01-05_REVISION - C1981019 (13)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2023-01-05_REVISION - C1981019 (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2023 8:46:18 AM
Creation date
1/9/2023 8:23:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
1/5/2023
Doc Name Note
& Findings
Doc Name
Notice of Proposed Decision
From
DRMS
To
Chris Gilbreath Tri-State Generation and Transmission Association
Type & Sequence
RN8
Email Name
ZTT
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Mine has no coal processing waste banks. <br /> IX. Coal Mine Waste- Rule 4.11 <br /> No water is used in the coal processing operation, except for dust suppression, and no coal <br /> processing waste is produced. <br /> Non-coal waste is placed in the backfill of pits in a manner consistent with the requirements of <br /> Rule 4.11.4. <br /> X. Slides and Damage- Rule 4.12 <br /> The Permit is found to be in compliance with Rule 4.12. Because of the mining technique used, <br /> natural barriers are not necessary. Slides have occurred within the permit boundary; however, <br /> none have had an adverse effect on public property, health, safety, or the environment. Slides <br /> have been reclaimed as appropriate. <br /> XI. Contemporaneous Reclamation - Rule 4.13 <br /> The Permit is in compliance with Rule 4.13. Reclamation occurs as contemporaneously as <br /> practicable with mining operations, as further discussed in Section XII below. <br /> XII. Backfilling and Grading- Rule 4.14 <br /> The Permit is in compliance with Rule 4.14. <br /> A. Operations and Reclamation Plans <br /> Colowyo's operations plan is found in Section 2.05.3 of the PAP (Volume 1 for the East Pit, <br /> West Pit, Section 16 Pit, Facilities Area and Gossard Loadout; Volume 12 for South Taylor Pit; <br /> Volume 15 for Collom Pit). Maps 23, 23A, and 23B of the PAP contain the mine plan. Section <br /> 2.05.4 of the PAP contains the reclamation plan, and Section 4.14 contains the performance <br /> standards for backfilling and grading. <br /> During the approval process of Permit Revision No. 2, the Division added Stipulation 2 <br /> regarding the Lower Wilson mining area to the operations and reclamation plan at the Mine. <br /> B. Contemporaneous Reclamation <br /> Section 4.13 of the PAP contains information on contemporaneous reclamation for Colowyo's <br /> multi-seam operations, with additional information found in Sections 2.05.4 and 4.14. <br /> Backfilling and grading cannot begin with multi-seam operations until the lowest seams are <br /> mined. Therefore, backfilling and grading cannot be completed within 180 days of the removal <br /> Proposed Decision and Findings of Compliance January 5,2023 <br /> Permit Renewal No. 8 Page 148 <br />
The URL can be used to link to this page
Your browser does not support the video tag.