Laserfiche WebLink
MR-226 MR-226 updated the mule deer and elk wildlife mitigation measures. <br /> MR-227 MR-227 corrected errors in Colowyo's water monitoring plan. <br /> MR-228 MR-226 incorporated a revised spoil grading plan and associated timing. <br /> MR-229 MR-229 revised Exhibit 5, Item 3 to relinquishment having an archeologist <br /> present during topsoil removal associated with the Collom Mining Area. <br /> MR-230 MR-230 updated the total backfill volume from the Collom Pit in Exhibit 13C. <br /> MR-231 MR-231 updated Exhibit 15 with air permits issued by the Colorado Department <br /> of Public Health and Environment. <br /> MR-232 MR-232 updated the cumulative bond schedule with additional topsoil removal to <br /> support advancement of surface and highwall mining, and documents White River <br /> Electric Association upgrade and installation of their power line within the permit <br /> boundary. <br /> MR-233 MR-233 documented Tri-State's work on their 345 kV power line within the <br /> permit boundary. These activities are not associated with the Colowyo Mine. <br /> MR-234 MR-234 incorporated minor spoil grading boundary revisions to the 2021 and <br /> 2022 spoil grading areas in the West Pit. <br /> MR-235 MR-235 provided documentation of the Collom Fire. <br /> MR-236 MR-236 provides a new certificate of liability insurance. <br /> MR-237 MR-237 updated Map lOB surface and groundwater monitoring locations for <br /> actual survey, correct discrepancies in two surface water sites, and clarifies <br /> groundwater standards for the point of compliance wells below Collom. <br /> MR-238 MR-238 incorporated additional topsoil removal to support advancement of <br /> surface and highwall mining for the Collom Pit. <br /> MR-239 MR-239 incorporated an additional blasting blend for Colowyo's blasting <br /> program. <br /> MR-240 MR-240 updated Exhibit 13C with additional areas scheduled for topsoil removal <br /> to support the advancement of surface and highwall mining in the Collom Pit. <br /> MR-241 MR-241 provided updates to the topsoil movement for the West and South Taylor <br /> Proposed Decision and Findings of Compliance January 5,2023 <br /> Permit Renewal No. 8 Page 114 <br />