Laserfiche WebLink
Page 7 <br /> 6.4.4 EXHIBIT D — Extraction Plan <br /> certification from a registered professional engineer that these structures will <br /> not be harmed by planned extraction profiles and extents. <br /> 'For lands within the Extraction Limits, only those structures, easements, and <br /> rights-of-way shown in Exhibit C-2: Extraction Plan Map, are anticipated to <br /> remain from those shown in Exhibit C-1: Existing Conditions Map. If changes <br /> to existing or possible revised structures, easements, or right-of-way are in <br /> any manner retained, or where they might occur subsequent to OMLR <br /> approval of this application, then a Technical Revision will be submitted to <br /> update Exhibit C-2: Extraction Plan Map. All established setback distances <br /> from planned activities to any remaining features will be maintained <br /> regardless. <br /> Operations or related Processing Areas and Wash Pond are not intended to <br /> affect existing structures, Easements, or Right-of-Ways within the Planned <br /> Extraction Limits identified as remaining and are designed to avoid and retain <br /> any remaining structure, Easement or Right-of-Way on the surface, and <br /> subsurface. Future agreements may be reached allowing mining in areas <br /> currently identified as being restricted to mining containing certain <br /> structures, Easements or Right-of-Ways. <br /> Exhibit C-1 shows and identifies all these features understood by us, and the <br /> respective Surveyed information, and correlated Observation and Title Work <br /> upon which they are based and represented on the attending Maps. The Maps <br /> are not Surveys. They are Maps and as such, they comprise a reasonable <br /> representation of all site features, but must not be relied upon by themselves <br /> exclusively for location purposes. Maps and features are not a substitute for <br /> field identification of underground structures and will rely upon location <br /> services of the 811 service. Setbacks where required will be based on the <br /> actual field locations of site features. <br /> Exhibit C-2 shows the remaining Oil Wells and Lines within Planned <br /> Operations at the time of the Submittal. Any revisions, additions, or <br /> modifications of residual Oil Wells or Lines will be avoided as represented on <br /> updated Maps and Revisions to the Permit, and consistent with Setback <br /> Distances identified in this submittal. Removal of any Existing Structures <br /> such as the Oil and Gas structures and or lines, will be updated on required <br /> Annual Reports, or by Technical Revision, as warranted, or as otherwise <br /> directed consistent with Colorado Statute. <br /> Access to the Theater of Operations: Entry into the permitted areas is <br /> dependent upon the needs and necessary management of continued <br /> agricultural activities during operations, as well as essential management and <br /> 1 Adequacy Item 18 <br /> VARRA COMPANIES, INC. TWO RIVERS SAND GRAVEL AND RESERVOIR PROJECT MARCH 2O22 <br /> A REGULAR IMPACT[1121 CONSTRUCTION PERMIT APPLICATION-COLORADO DIVISION OF RECLAMATION MIING&SAFETY <br /> OFFICE OF MINED LAND RECLAMATION <br />