My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-01-04_PERMIT FILE - M2022013 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2022013
>
2023-01-04_PERMIT FILE - M2022013 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2023 8:47:46 PM
Creation date
1/4/2023 7:42:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2022013
IBM Index Class Name
Permit File
Doc Date
1/4/2023
Doc Name Note
Cover Letter
Doc Name
Adequacy Review Response #2
From
Raptor Materials, LLC
To
DRMS
Email Name
RDZ
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
56) Please provide an affidavit or receipt indicating the date on which the revised <br /> application information required to address this adequacy letter was placed with the <br /> Weld County Clerk. <br /> Raptor Materials First Adequacy Response <br /> An updated affidavit is provided and attached as Exhibit R? <br /> Division Second Adequacy Comment <br /> No additional response is required from _01 <br /> 6.4.19 Exhibit S - Permanent Man-made Structures <br /> 57) The Division requires Raptor Materials LLC to demonstrate that they attempted <br /> to obtain notarized structure agreements with all owners of the structures within <br /> 200 feet of the affected area of the proposed mine site, pursuant to Rule 6.4.19. <br /> This attempt must be made prior to the Division's consideration of a stability <br /> analysis. Please also indicate what agreements have been obtained. <br /> Raptor Materials First Adequacy Response <br /> This information was provided earlier via Susan Bergmaier submittal of <br /> Notifications, with the signed versions of an agreement sent to all owners of <br /> structures known to us. <br /> Division Second Adequacy Comment <br /> • RMneeds to update E-xhibit S ulth all relevant Information including. <br /> o A list of all structure owners <br /> o A list of agreements obtained from these owners. <br /> Raptor Materials Second Adequacy Response <br /> Exhibit S has been revised as requested (page 2, Footnote 1). <br /> 6.5 Geotechnical Stability Exhibit <br /> 58) The Division has reviewed the Slope Stability Analyses (prepared by AWES, <br /> LLC), and our comments are provided as an enclosure with this letter. Please <br /> review this memorandum and provide responses. <br /> Raptor Materials First Adequacy Response <br /> Please refer to AWES Report dated August 10, 2022, now appended to the <br /> 541Page <br /> Correspondence to the Colorado Office of Mined Land Reclamation—Reply to Rob Zuber,EPS—Adequacy Letters of 24 June and 5 <br /> August 2022;in the matter of the Two Rivers Sand,Gravel and Reservoir Project—M2022-013. <br />
The URL can be used to link to this page
Your browser does not support the video tag.