My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-01-04_PERMIT FILE - M2022013 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2022013
>
2023-01-04_PERMIT FILE - M2022013 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2023 8:47:46 PM
Creation date
1/4/2023 7:42:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2022013
IBM Index Class Name
Permit File
Doc Date
1/4/2023
Doc Name Note
Cover Letter
Doc Name
Adequacy Review Response #2
From
Raptor Materials, LLC
To
DRMS
Email Name
RDZ
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Raptor Materials First Adequacy Response <br /> Please see response item "Issue - Prairie Dogs" prepared by ERO dated August 26, <br /> 2022 attached as an addendum to Exhibit H. <br /> Division Second Adequacy Comment <br /> No additional response is required from RM. <br /> 26) The applicant should discuss the following (related to Rule 3.1.8): How will the <br /> operation minimize impacts on mule deer habitat during the winter season <br /> (December 1 through April 30). This should include (but not be limited to) a <br /> discussion on fencing. Fencing should be limited as practical, and wildlife-friendly <br /> fencing should be used. <br /> Raptor Materials First Adequacy Response <br /> Please see response item "Issue - Mule Deer (severe winter range and migration <br /> corridors)" and "Issue - Fencing" prepared by ERO dated August 26, 2022 attached <br /> as an addendum to Exhibit H. <br /> Division Second Adequacy Comment <br /> No additional response is required from RILL <br /> 27) Include a discussion on how the operation will allow for deer and other animals <br /> to "escape" the mining operations. <br /> Raptor Materials First Adequacy Response <br /> Please see response item "Issue Escape Ramps" prepared by ERO dated August <br /> 26, 2022 attached as an addendum to Exhibit H. <br /> Division Second Adequacy Comment <br /> No additional response is required from RM. <br /> 6.4.5 Exhibit E - Reclamation Plan <br /> 28) The Application form specifies that the post-mining land use of the site will be <br /> Developed Water Resource. Additionally, the Applicant has provided a <br /> shadowing/mounding analysis for the installation of clay liners. However, the <br /> Reclamation Plan notes (page 5) that lining of the reservoirs is an option only. If the <br /> 331Page <br /> Correspondence to the Colorado Office of Mined Land Reclamation—Reply to Rob Zuber,EP5—Adequacy Letters of 24 June and 5 <br /> August 2022, in the matter of the Two Rivers Sand,Gravel and Reservoir Project—M2022-013. <br />
The URL can be used to link to this page
Your browser does not support the video tag.