Laserfiche WebLink
<br /> <br />Rule 2: Permits <br />TABLE 2.05.4-1f <br />LORENCITO CANYON MINE <br />SOIL DISTRIBUTION PLAN <br />Area Description or Acres Depth Source Equipment Volume Distance <br />Code (Ref. Ma 2.05.3-5) (In) (Yd3) (Ft) <br /> Fill 7 5.8 8" Recovered from Current Mining Live-Handled 7750 <br /> Fill 9 8.2 8" Recovered from Current Mining Live-Handled 7100 <br />-°-o' S-1 1.3 8" Recovered from Current Mining Live-Handled 430 <br />m N-3 3.3 8" Recovered from Current Mining Live-Handled 3650 <br /> N-4 1.6 8" Recovered from Current Mining Live-Handled 1180 <br />J E-1 (East Facing Slope) 1.6 6" Recovered from Current Mining Live-Handled 1210 <br /> Subtotal 21.8 <br />_ Fill 7a 3.7 8" BA#1 (West of Mining) FEL, Trucks 3440 1200 <br /> Fill 9a 3.2 8" SSP#2 (East of Mining) FEL, Trucks 4950 700 <br /> Fill 8 8.6 8" SSP#3 (Adj. to Fill 8) FEL, Trucks 8820 400 <br />~, N-1 4.8 8" SSP#2 (East of Mining) FEL, Trucks 5060 600 <br />~ C-1 12.8 8" BA#2 (West of Fill 8) FEL, Trucks 7750 800 <br />~ C-2 6.0 8" BA#1 (West of Mining) FEL, Trucks 5590 900 <br />-o S-2 1.6 8" BA#2 (West of Fill 8) FEL, Trucks 970 8100 <br />°' S-4 (Coal Disposal Area) 3.0 8" BA#3 (South of Pond 6) FEL, Trucks 2370 2200 <br />o W-2 10.7 8" BA#2 (West of Fill 8) FEL, Trucks 7530 2200 <br />3 W-3 (Drainage to Pond 7) 1.8 8" BA#3 (South of Pond 6) FEL, Trucks 1830 1500 <br />~ W-5 (West Flats) 9.1 8" BA#3 (South of Pond 6) FEL, Trucks 7640 2700 <br />t` Service Area 0.4 4" + SA Soil Stockpile D-8 210 75 <br /> 4" Haul Road Stockpiles FEL, Trucks 210 6000 <br /> __ Subtotal 65.7 <br /> W-1 5.8 4" + Recovered from Current Mining Live-Handled 2740 <br /> 4" W-1 Upslope Area _ D-8 or D-11 2740 125 <br /> W-4 3 4" + Recovered from Current Mining Live-Handled 1090 <br /> 4" W-4 Upslope Area _ _ D-8 or D-11 1090 125 <br /> W-6 4.1 4" + Recovered from Current Mining _ <br />Live-Handled 1400 _ <br /> 2" + W-6 Upslope Area D-8 or D-11 700 75 <br />~ 2" BA#3 (South of Pond 6) FEL, Trucks 700 3000 <br />~ N-2 9.7 4" + Recovered from Current Mining Live-Handled 6300 <br /> 4" N-2 Upslope Area D-8 or D-11 6300 1 <br />50 <br />o S-3 3.2 4" + Recovered from Current fvlining Live-Handled __ <br />_ _ <br />890 _ <br />. <br />0 4" + S-3 Upslope D-8 480 75 <br />0 4" BA#3 (South of Pond 6) FEL, Trucks 480 2400 <br />o` N-1 (Soil Stockpile Area) 2.9 8" SSP#2 (East of Mining) _ <br />_ D-8 3100 100 <br />~ E-2 (East Facing Slope) 1.2 4" + Recovered from Current Mining Live-Handled _ _ <br />750 <br /> 4" E-2 Upslope Area __ D-8 or D-11 750 75 <br />o E-3 (East Facing Slope) 1.9 4" + Recovered from Current Mining Live-Handled 900 <br />t 4" BA#3 (South of Pond 6) __ _ _F_E_ L, Trucks 900 2800 <br /> BA-1 (Borrow Area #1) 1.3 8" BA-1 Upslope D-8 1080 100 <br /> BA-2 (Borrow Area #2) 1.9 8" BA-2 Upslope D-8 1290 100 <br /> BA-3 (Borrow Area #3) 2.7 8" BA-3 Upslope D-8 2900 100 <br /> Load-out 4.5 Soil Stockpile #1 (Load-out) D-8 14000 200 <br /> Subtotal 42.2 <br />a <br />a~ <br /> <br /> Office Area 0.5 0 None -Remains as a Permanent Facility <br />~ I caul and Access Roacis 21.8 0 None -Remains as a Permanent Facility <br />- _" Sediment-P_auls-_ - -4,5 - ---- - _- --- - --- -- - - <br /> <br />0 <br />z <br />Subtotal <br />26.8 <br /> TOTAL ACRES 156.5 Total Volume Soil Handled - .128,270 <br /> Live Handled 35,390 <br /> Dozer Push 34,640 <br />E Truck from BA-1 9,030 <br />E Truck from BA-2 16,250 <br />~ <br />m Truck from BA-3 13,920 <br /> Truck from Stockpile #2 (East of Mining) 10,010 <br /> Truck from Stockpile #3 (Fill 8) 8,820 <br /> Truck from Road Stockpiles 210 <br />Note: Soil Stockpile #1 (Loadout) containing 14,000 yd', Haul Road Soil Stockpiles containing 200 yd', and SA (Service Area) <br />Soil Stockpile are shown on Map 2.05.3-2 <br />TR-13 2.05-59 (01/03/05) <br />