Laserfiche WebLink
Page 38 of 264 <br /> Weight description: User Provided <br /> Job Condition Correction Factor Source <br /> Operator Skill: 1.000 (EXCL.) <br /> Material consistency: 1.000 (CAT HB) <br /> Dozing method: 1.000 (GEN.) <br /> Visibility: 1.000 (AVG.) <br /> Job efficiency: 0.790 (3 SHIFTS/DAY) <br /> Spoil pile: 0.900 (SSD-FC) <br /> Push gradient: 1.115 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 0.929 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.7365 <br /> Adjusted unit 1,493.62 LCY/hr <br /> production: <br /> Adjusted fleet 5974.48 LCY/hr <br /> production: <br /> JOB TIME AND COST <br /> Fleet size: 4 Dozer(s) <br /> Unit cost: $0.260/LCY <br /> Total job time: 13.25 Hours <br /> Total job cost: $20,554 <br /> Trapper RN8 2022 December <br />