Laserfiche WebLink
Page 24 of 264 <br /> Weight description: Earth-Dry packed <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750 (AVG.) <br /> Material consistency: 1.000 (CAT HB) <br /> Dozing method: 1.000 (GEN.) <br /> Visibility: 1.000 (AVG.) <br /> Job efficiency: 0.830 (1 SHIFT/DAY) <br /> Spoil pile: 0.800 (SSD-AC) <br /> Push gradient: 0.786 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 0.902 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.3531 <br /> Adjusted unit 716.09 LCY/hr <br /> production: <br /> Adjusted fleet 2864.36 LCY/hr <br /> production: <br /> JOB TIME AND COST <br /> Fleet size: 4 Dozer(s) <br /> Unit cost: $0.505/LCY <br /> Total job time: 72.55 Hours <br /> Total job cost: $105,020 <br /> Trapper RN8 2022 December <br />