Laserfiche WebLink
Page 21 of 264 <br /> BULLDOZER WORK <br /> Task description: D/E Pit Regrade(West) <br /> Site: Trapper Mine Permit Action: RN8 Permit/Job#: C1981010 <br /> PROJECT IDENTIFICATION <br /> Task#: 005A State: Colorado Abbreviation: None <br /> Date: 9/1/2022 County: Moffat Filename: C010-005A <br /> User: RAR <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat DIIT- IIU <br /> Horsepower: 850 <br /> Blade Type: Universal <br /> Attachment: NA <br /> Shift Basis: 3 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $257.09 NA <br /> Operating Cost/Hour: $273.21 100 <br /> Ripper own. $0.00 NA <br /> Cost/Hour: <br /> Ripper op. Cost/Hour: $0.00 0 <br /> Operator Cost/Hour: $41.55 NA <br /> Total unit Cost/Hour: $571.85 <br /> Total Fleet Cost/Hour: S3,431.11 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 521,710 <br /> Swell factor: 1.000 <br /> Loose volume: 521,710 LCY <br /> Source of estimated volume: Permit Appendix A,Table 1.4-2 <br /> Source of estimated swell Cat Handbook <br /> factor: <br /> HOURLY PRODUCTION <br /> Average push distance: 360 feet <br /> Unadjusted hourly 894.7 LCY/hr <br /> production: <br /> Materials consistency Consolidated stockpile 1.0 <br /> description: <br /> Average push -5 % <br /> gradient: <br /> Average site altitude: 7,000 feet <br /> Material weight: 2,475 lbs/LCY <br /> Trapper RN8 2022 December <br />