Laserfiche WebLink
Cost Summary Worksheet Cont'd Task#000 Page 2 of 4 <br /> 064 Rip D Pit Haul Roads(D 1,D3,D4,D5 and RIPPER 4 8.40 $13,311 <br /> Dmain) <br /> 065 Rip West Ash Haulroads(West Ash,West Ashl RIPPER 4 5.98 $9,474 <br /> and West Ash 2) <br /> 066 Rip LOM Haul Roads(F2 and F2-G5) RIPPER 4 8.76 $13,879 <br /> 067 Rip A Pit Haul Roads(Middle A and North A) RIPPER 4 6.43 $10,184 <br /> 068 Rip N Pit Haul Roads RIPPER 4 5.38 $8,526 <br /> 072 Rip East A Haul Roads(East A and East A Split) RIPPER 4 2.96 $4,690 <br /> 074 Rip Access Road(Tasks 042-061) RIPPER 4 3.11 $4,926 <br /> 075 Rip K Pit Haul Roads(KMain,KI,K2,K3) RIPPER 4 2.12 $3,363 <br /> 076 Rip K Pit Haul Roads(TR106) RIPPER 4 3.37 $5,338 <br /> 080 Regrade Coyote Impoundment DOZER 2 288.69 $208,963 <br /> 081 Regrade Middle Pyeatt Impoundments DOZER 1 51.73 $18,721 <br /> Impoundment(1,2,3) <br /> 082 Regrade Far East Buzzard Impoundment DOZER 1 0.56 $204 <br /> 083 Regrade Sage Impoundments(1 and 2) DOZER 1 18.91 $6,845 <br /> 084 Regrade West Horse Impoundment DOZER 1 3.52 $1,273 <br /> 085 Regrade Impoundment H DOZER 1 7.29 $2,637 <br /> 086 Regrade Industrial Waste Pond DOZER 1 7.47 $2,703 <br /> 087 Regrade Deal 1 and 2 DOZER 1 9.83 $3,835 <br /> 088 Regrade Deacon 1,2 and Jeffway 1,2 DOZER 1 94.72 $36,962 <br /> impoundments <br /> 089 Regrade Diversions DOZER 1 21.86 $6,132 <br /> 090 Replace Topsoil on Ash Pits(ASH 1) SCRAPERl 1 6.32 $36,497 <br /> 090A Replace Topsoil on Ash Dump SCRAPERl 1 18.36 $106,037 <br /> 091A Replace Topsoil on D/E Pits SCRAPERl 1 29.19 $147,159 <br /> 091A Replace Topsoil on D/E Pits SCRAPERl 1 3.46 $17,006 <br /> A <br /> 096 Replace Topsoil at West Panel,BC rd, Shop SCRAPERl 1 15.36 $89,131 <br /> 097 Replace Topsoil at East Panel Ponds,A road SCRAPERl 1 25.08 $144,823 <br /> 098 Re-topsoil Johnson Coal Stockpile SCRAPERl 1 3.66 $21,342 <br /> 100 Facilities Area REVEGE 1 75.00 $36,711 <br /> 100A Seed D Pit Range A-B REVEGE 1 204.60 $225,291 <br /> 101 Roads(including BC road)below 6700' REVEGE 1 196.00 $96,085 <br /> 102 Finish Grading I/J Pit GRADER 2 21.73 $13,139 <br /> 103 Ponds below 6700'(Coyote, Sage,E Buzzard) REVEGE 1 26.00 $12,727 <br /> 104 Johnson Coal Stockpile REVEGE 1 6.00 $3,182 <br /> 105 topsoil piles below 6700' REVEGE 1 27.00 $13,265 <br /> 107 Roads: >6700 ft.-Rangeland with Shrubs REVEGE 1 54.00 $43,633 <br /> 108 Ash pit.-Rangeland with Shrubs REVEGE 1 87.00 $72,130 <br /> 109 Seed D/E Pit Range B REVEGE 1 29.60 $19,477 <br /> III Ponds above 6700'(Deal,Deacon,Jeffways,West REVEGE 1 19.00 $15,062 <br /> Horse) <br /> 112 topsoil piles above 6700' REVEGE 1 5.00 $4,106 <br /> 113 Shrub Transplants as per operator NA 1 40.00 $155,204 <br /> 120 Seal 1 remaining Borehole(MR212 others were BOREHOLE 1 4.00 $4,253 <br /> mined through) <br /> 121 Seal 20 Developmental Drill Holes BOREHOLE 1 111.00 $56,561 <br /> 122 Seal Monitoring Wells BOREHOLE 1 74.00 $115,668 <br /> 123 Sealing Stations 1-4 BOREHOLE 1 6.24 $9,291 <br /> 124 Seal 4 Monitoring Wells(MR217) BOREHOLE 1 6.24 $31,028 <br /> 125 Seal GLEV-1, GLEV-2 and GLEV-3 Wells BOREHOLE 1 4.00 $4,701 <br /> 126 Seal Monitoring Well 95-LW9(MR223) BOREHOLE 1 7.00 $8,240 <br /> 127 Sealing wells CY-1, CY-2, CY3 as per operator NA 1 8.00 $7,422 <br /> CIRCES Cost Estimating Software <br />