Laserfiche WebLink
Page 12 of 264 <br /> Weight description: User Provided <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750 (AVG.) <br /> Material consistency: 1.000 (CAT HB) <br /> Dozing method: 1.200 (S-BY-S) <br /> Visibility: 1.000 (AVG.) <br /> Job efficiency: 0.790 (3 SHIFTS/DAY) <br /> Spoil pile: 0.900 (SSD-FC) <br /> Push gradient: 1.601 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 0.929 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.9517 <br /> Adjusted unit 498.98 LCY/hr <br /> production: <br /> Adjusted fleet 997.96 LCY/hr <br /> production: <br /> JOB TIME AND COST <br /> Fleet size: 2 Dozer(s) <br /> Unit cost: $0.726/LCY <br /> Total job time: 89.07 Hours <br /> Total job cost: $64,516 <br /> Trapper RN8 2022 December <br />