Laserfiche WebLink
(2) The watershed control of the area shall be improved. There will not be a <br /> significant change to the post-mining watershed areas that would impact <br /> seasonal or flood flows. The sediment yield per acre,postmining in the L and <br /> Ash pits shall be less than pre-mining levels. <br /> (3) The land above the highwalls in the Ash and L pits will only be disturbed in <br /> compliance with the approved mining and reclamation plan as depicted on map <br /> M10A and M10B and will be necessary for the establishment of the proposed <br /> post-mining topography as shown on Map M12. <br /> (5) The proposed plan, if implemented as described in the permit application <br /> package should allow compliance with Rule 2.06.5. <br /> (6)Not applicable to this operation. <br /> (2)(g) The proposed operation should allow for other requirements of the Act, Rules <br /> and this regulatory program to be met should TMI conduct the operation as <br /> proposed. <br /> XXI. In Situ Processing <br /> No specific approvals are granted to the applicant under this section. <br /> 23 <br />