Laserfiche WebLink
(4.15.2). In conjunction with Trapper's years of reclamation experience, Trapper has <br /> reduced the number of introduced species in the seed mixes utilized at the site. DRMS <br /> found the seed mix adjustments acceptable. <br /> 2. Methods to measure species diversity, woody plant density, herbaceous cover and <br /> production are discussed in permit section 4.4.1, Volume IV. Seed mixes and <br /> revegetation practices are designed to meet diversity standards set forth in the permit. The <br /> applicant will reestablish shrubs on Range Sites A and B by including various native <br /> shrubs in the seed mixes and by transplanting mature woody shrub clumps. There is no <br /> shrub density standard for Range Site C.(4.15.7(1)). <br /> XII. Post-minim Land Use <br /> Post-mining land use is discussed under Section 4.2, Vol. IV of the permit application. <br /> Cropland, rangeland and wildlife habitat are currently approved post-mining land <br /> uses. These land uses meet the criteria of Rule 4.16.3. <br /> XHI. Protection of Fish, Wildlife and Related Environmental Values <br /> Section 4.6 of Vol. IV of the permit application discusses the protection of fish, wildlife and <br /> related environmental values. <br /> Wildlife habitat is a planned post-mining land use. The applicant selected <br /> appropriate plant species and distributions to benefit fish and wildlife(4.18(4)(1)). <br /> XIV. Protection of Underground Minim <br /> At the time of this writing (December 2022), Trapper will be conducting further mining on the west <br /> end with the proposal of PRl1. The area has been fully reclaimed (4.19(1) and 4.22.4(1)). <br /> XV. Subsidence Control <br /> No specific approvals are granted to the applicant under this section. <br /> XVI. Concurrent Surface and Underground Minim <br /> No specific approvals are granted to the applicant under this section. <br /> XVII—Auger Mining—Rule 4.23 <br /> Auger or"Highwall mining" is planned in the I, J, L and N pits. Subsidence is not anticipated with <br /> any highwall mining activities at the site. Trapper is not currently aware of any abandoned or active <br /> underground mine workings in any of the pertinent coal seams in the proposed highwall mining <br /> areas. In the event abandoned or active underground mining operations are identified, no highwall <br /> mining will be conducted within 500 feet of previous workings in the applicable seams. Trapper is <br /> also not aware of any dwellings,buildings, tanks,impoundments or utilities overlying areas planned <br /> for highwall mining. Design criteria established by Agapito Associates Inc. will be utilized to ensure <br /> long-term stability of highwalls and mining areas based on seam and overburden thickness. Access to <br /> highwall miner entries will be blocked or buried within 30 days following coal extraction. <br /> XVIL Operations on Alluvial Valley Floors <br /> Operations on alluvial valley floors (AVFs) are discussed in Section 4.8.4 of Vol. IV of the <br /> 20 <br />