Table 6 <br /> Base Model and Modeled Site Groundwater Level Full Buildout Both Sites <br /> Full Buildout and <br /> Mitigation Difference From <br /> Location Baseline All SW Baseline Conditions <br /> Patnd a House 47363 4736.0 -0 33 <br /> Cline House 47368 4737.3 050 <br /> Harding House 4736.6 47378 1.25 <br /> Wiedeman House 13434 47382 4739.6 140 <br /> Madman House 13218 4738.5 4738.1 -0.40 <br /> Sharp House 47384 47380 -0.44 <br /> HS Land and Cattle 47326 4732.1 -0.50 <br /> Karbowski Brave House 4725.5 47229 -2 55 <br /> Schmidt Well 4714.4 4708.9 -5 54 <br /> United Well 4712.0 4706.3 -5.69 <br /> Owens Well 4714.2 47102 400 <br /> Wright House 47174 4711 1 -6 30 <br /> Schmidt House 47184 47153 -3.10 <br /> Smit House 47188 4716.5 -2 30 <br /> Kissler House 47295 47294 -010 <br /> Woolverton House 4730.8 47307 -010 <br /> Shimon House 4733.0 47331 0.10 <br /> Kern House 47338 4733.9 010 <br /> Rainbolt House 4735.9 47360 008 <br /> Gilcrest Valley HS 4737.0 47366 -0 37 <br /> 6.3.2 Mitigation Scenario 2—Discharge to Infiltration Pond <br /> Scenario 2 is similar to Scenario 1 in that it uses the Drain and Well Packages to remove water from the model. <br /> Scenario 2 then utilizes the Recharge Package to add the approximate amount of water removed back to the model in <br /> the cells north of Cell 7 to simulate an infiltration pond in that location. Discharging to an infiltration pond located onsite <br /> is the recommended scenario because it will allow all infrastructure to be constructed inside of the DRMS Affected Area <br /> boundary and has the added benefit of mitigating the drop of groundwater head elevations to the north of the site as a <br /> result of slurry wall obstruction. <br /> 6.3.2.1 Phase 1 <br /> In addition to the underdrain or dewatering wells discussed in Section 6.3.1.1,the infiltration pond will be constructed <br /> prior to the Cell 4 slurry wall and the underdrain or dewatering wells. Water is removed from the system by the <br /> dewatering wells or underdrain and piped to a manhole located towards the southern end of the site west of the Western <br /> Mutual Ditch. Water is then piped north through the middle of the site to the infiltration pond. The infiltration pond is <br /> expected to be five(5)acres in size, approximately twenty-five(25)feet in depth north of Cell 7, and completed in native <br /> aggregate. The recharge rate for the pond area was set to 0.705 feet per day which resulted in 281,044 cubic feet per <br /> day of recharge or 3.25 cubic feet per second,which corresponds to the amount of water removed by the Well Package. <br /> Figure 11 depicts the site layout for this phase and the head contours. Table 7 shows the groundwater head elevation <br /> for the wells to the north of the site: <br /> Groundwater Model Report—Section 20 Gravel Mine Site -12- August 2022 <br />