My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-12-21_PERMIT FILE - M2022001
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2022001
>
2022-12-21_PERMIT FILE - M2022001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2022 9:06:41 AM
Creation date
12/27/2022 11:01:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2022001
IBM Index Class Name
Permit File
Doc Date
12/21/2022
Doc Name Note
Response No 7
Doc Name
Adequacy Review Response
From
Red Tierra Equities, LLC/Civil Resources, LLC
To
DRMS
Email Name
PSH
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MW-5 and MW-6,coincides with an approximate one (1)foot rise in town. To mitigate against possible groundwater <br /> elevation rise in town, a two(2)foot cut off was used to implement mitigation at the southern site boundary. <br /> The shadow affect to the north will likely be minimized by the proximity to the unnamed slough and the infiltration ponds <br /> to the northeast of the Site. During mining at the Site, an unlined siltation pond will be present in the northwest comer of <br /> the Site which will also mitigate some of the shadow affect. Mitigation for the shadow affect is not anticipated to be <br /> necessary since the saturated thickness of the alluvial deposit is eighteen (18)to twenty(20)feet a full buildout of both <br /> sites. Even though mitigation is not anticipated to be necessary for the shadow affect to the north, it is recommended <br /> that an infiltration pond be installed north of Cell 7 to receive the rerouted groundwater from the south of the site. This <br /> will enable all the mitigation infrastructure to be constructed within the Division of Reclamation, Mining, and Safety's <br /> Affected Area Boundary. <br /> Two(2)mitigation scenarios were modeled to provide optionality for the method of return of the groundwater to the <br /> hydrologic system;either directly to the river or through infiltration. Each scenario was modelled in two(2)phases <br /> coinciding with the construction schedule of the Site and the Monarch DENIM slung walls.The first phase is an <br /> underdrain or series of dewatering wells along the eastern half of the site parallel to Weld County Road 42. The second <br /> phase is the construction of an underdrain between Cell 6 and the Western Mutual Ditch west of where the ditch crosses <br /> on to the property to approximately 200 feet east of Highway 60. <br /> 6.3.1 Mitigation Scenario 1—Direct Discharge to the South Platte <br /> This mitigation scenario utilized the Well and Drain Package to remove water from the model. Water is not returned to <br /> the model to simulate surface discharge or direct discharge to the South Platte. This option would require an <br /> Amendment to the DRMS Reclamation Permit Application or Permit to add the underdrain discharge pipe to the Affected <br /> Area. The exact route for the offsite underdrain discharge pipe for this Scenario is not discussed in this report. <br /> 6.3.1.1 Phase 1 <br /> Mounding at the southern end of the Site boundary and in Town is not expected to rise more than two(2)feet before the <br /> construction of the Cell 4 slurry wall so mitigation is not warranted until the Cell 4 slurry wall is constructed or Site <br /> monitoring observes a higher than anticipated groundwater elevation at the southern monitoring wells(MW-5 and MW-6). <br /> See Table 4 below and Figures 8 and 9. <br /> Table 4 <br /> Base Model and Modeled Site Groundwater Level After Cell 3 Slurry Wall <br /> Modeled Cell 3,4 and 5N <br /> Well Base Slurry Wall Difference Cell IJK <br /> MW-1 4,726.9 4,726.4 -0.5 146,111,1 <br /> MW-2 4,717.8 4,716.0 -1.8 136119,1 <br /> MW-3 4,725.0 4,725.8 0.8 142136,1 <br /> MW-4 4,732.5 4,734.1 1.6 153,136,1 <br /> MW-5 4,736.7 4,736.8 0.1 162,1331 <br /> MW-6 4,738.4 4,737.2 -1.2 162,115,1 <br /> MW-7 4,729.1 4,728.2 -0.9 148,1221 <br /> BBA-MW4 4741.3 4,740.9 -0.4 148,122,2 <br /> BBA-MW11 4,737.1 4,737.5 0.4 148,122,3 <br /> BBA-MW18 4,7386 4,738.9 0.3 148,122,4 <br /> BBA-EC 4,732.5 4,732.9 0.4 148,122,5 <br /> A series of wells were modelled at the southeastern comer of the site after the addition of the Cell 4 slurry wall and the <br /> Monarch DENM Cell 1 slurry wall. These wells were set to pump 2.25 cubic feet per second(CFS)and removed the <br /> Groundwater Model Report—Section 20 Gravel Mine Site -10- August 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.