Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task#00113 Page 3 of 3 <br /> Haul Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 11428.00 10.00 3.00 13.00 620 18.513 <br /> Haul Time: 18.513 minutes <br /> Return Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 11428.00 -10.00 3.00 -7.00 3450 3.415 <br /> Return Time: 3.415 minutes <br /> Total Truck Cycle Time: 25.422 minutes <br /> Loading Tool unit <br /> Production 3,812.84 LCY/Hour Adjusted for job efficiency: 3,164.66 LCY/Hour <br /> Truck Unit Production <br /> 344.06 LCY/Hour Adjusted for job efficiency: 285.57 LCY/Hour <br /> Optimal No.of Trucks: 11 Truck(s) Selected Number of Trucks: 11 Truck(s) <br /> Adjusted hourly truck team production: 3,141.25 LCY/Hour <br /> Adjusted single truck/loader team production: 3,141.25 LCY/Hour <br /> Adjusted multiple truck/loader team production: 3,141.25 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 40.89 Hours <br /> Unit cost: $2.182 /LCY Total job cost: $280,245 <br /> CIRCES Cost Estimating Software <br />