Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task#080 Page 4 of 4 <br /> Haul Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> (min) <br /> 1 10000.00 0.00 3.00 3.00 2754 4.082 <br /> 2 6000.00 0.00 3.00 3.00 2754 2.179 <br /> Haul Time: 6.261 minutes <br /> Return Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 6000.00 0.00 3.00 3.00 4074 1.816 <br /> 2 10000.00 0.00 3.00 3.00 4074 2.455 <br /> Return Time: 4.271 minutes <br /> Total Truck Cycle Time: 13.762 minutes <br /> Loading Tool unit <br /> Production 787.00 LCY/Hour Adjusted for job efficiency: 653.21 LCY/Hour <br /> Truck Unit Production <br /> 127.53 LCY/Hour Adjusted for job efficiency: 105.85 LCY/Hour <br /> Optimal No. of Trucks: 6 Truck(s) Selected Number of Trucks: 4 Truck(s) <br /> Adjusted hourly truck team production: 423.38 LCY/Hour <br /> Adjusted single truck/loader team production: 423.38 LCY/Hour <br /> Adjusted multiple truck/loader team production: 423.38 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 3.98 Hours <br /> Unit cost: $2.038 /LCY Total job cost: $3,434 <br /> CIRCES Cost Estimating Software <br />