Laserfiche WebLink
COST SUMMARY WORK <br /> Task description: Reclamation Cost Summary <br /> Site: Deserado Mine Permit Action: 2022 Midterm Review Permit/Job#: C1981018 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 11/7/2022 County: Moffat Filename: C018-000 <br /> User: CCW <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Regrade D-Portal Area SCRAPERI 3 83.39 $298,164 <br /> 002 Regrade D-Portal Area DOZER 4 145.14 $200,888 <br /> 003 Regrade Water Storage Areas and Access Road DOZER 4 2.85 $4,043 <br /> 004 Regrade East Portal Ventilation Entry Area and DOZER 4 8.04 $11,408 <br /> Access Road <br /> 005 Regrade Alluvial Well Area and Access Road DOZER 4 1.41 $1,999 <br /> 006 Regrade Overland Conveyor Corridor and DOZER 4 99.77 $141,624 <br /> Maintenance Road <br /> 007 Regrade Slot Storage Area DOZER 4 45.26 $64,241 <br /> 008 Regrade and Topsoil Halandras Landfill DOZER 4 3.65 $5,057 <br /> 009 Regrade Drill Pads,Ponds,Low Cells,Roads and DOZER 4 32.90 $45,543 <br /> Ditches <br /> O10 Recontouring the Haul Road/County Road 65 SCRAPERI 1 6.38 $3,774 <br /> Intersection <br /> Oil Rip Gravel Pad at Rock Dust Facilities Area RIPPER 4 0.39 $561 <br /> 012 Regrade Rock Dust Bin Facility Area DOZER 4 0.58 $801 <br /> 013 Regrade Drill Pads from MR's/TR's Approved DOZER 4 26.27 $36,367 <br /> After MT-06 <br /> 014 Backfill and Regrade B-Seam Vent Shaft DOZER 4 1.63 $2,255 <br /> 015 Backfilling Geotech Test Pits DOZER 1 13.11 $804 <br /> 025a Cover RP2/3/4/5a with Subsoil SCRAPERI 3 140.53 $502,476 <br /> 026 Regrade and Cover Refuse Disposal Area RP-I SCRAPERI 3 4.25 $15,186 <br /> 028 Haul Temporary Refuse from Facilities Area to TRUCKI 1 128.41 $111,460 <br /> RP-2/3/4/5a <br /> 029 Cmpact Refuse at RP 2/3/4, 5a,and Facilities Area COMPACT 1 281.95 $65,606 <br /> Refuse <br /> 030 Move and Spread Stockpiled Refuse on RP- SCRAPERI 3 79.85 $285,488 <br /> 2/3/4/5a <br /> 031 Grade Uncompacted Refuse at RP 2/3/4/5a DOZER 4 5.85 $8,094 <br /> 035 Rip Drill Pads and Access Roads RIPPER 4 7.67 $10,894 <br /> 036 Regrade Coal Laydown Area GRADER 1 0.76 $171 <br /> 037 Rip Parking Lot and Access Road Pavement RIPPER 4 1.63 $2,323 <br /> 042 Remove Parking Lot and Access Road Pavement TRUCKI 1 7.12 $3,630 <br /> 043 Regrade Plant Access/Haul Road Area SCRAPERI 3 60.26 $215,454 <br /> 044 Regrade East Portion of Refuse Haul Road SCRAPERI 3 23.04 $82,365 <br /> 045 Regrade Pond DP-1 and Explosives Storage Area DOZER 4 24.53 $33,948 <br /> and Access Rd <br /> 046 Rip Roadhouse and Coal Laydown Area Base RIPPER 4 0.79 $1,122 <br /> 048 Regrade Access Road and Vent Shaft DOZER 4 0.16 $216 <br />