Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task#065 Page 4 of 4 <br /> Haul Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> (min) <br /> 1 2640.00 4.00 3.00 7.00 1134 2.399 <br /> Haul Time: 2.399 minutes <br /> Return Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 2640.00 -4.00 3.00 -1.00 4254 0.652 <br /> Return Time: 0.652 minutes <br /> Total Truck Cycle Time: 6.751 minutes <br /> Loading Tool unit <br /> Production 562.50 LCY/Hour Adjusted for job efficiency: 466.88 LCY/Hour <br /> Truck Unit Production <br /> 224.97 LCY/Hour Adjusted for job efficiency: 186.72 LCY/Hour <br /> Optimal No. of Trucks: 3 Truck(s) Selected Number of Trucks: 2 Truck(s) <br /> Adjusted hourly truck team production: 373.44 LCY/Hour <br /> Adjusted single truck/loader team production: 373.44 LCY/Hour <br /> Adjusted multiple truck/loader team production: 373.44 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 3.75 Hours <br /> Unit cost: $1.357 /LCY Total job cost: $1,900 <br /> CIRCES Cost Estimating Software <br />