Laserfiche WebLink
Cost Summary Worksheet Cont'd Task#000 Page 2 of 4 <br /> 055 Grade Topsoil/Subsoil Storage Area GRADER 1 11.53 $2,569 <br /> 056 Backfill and Regrade MR-171 Access Roads DOZER 1 18.58 $6,428 <br /> 057 Backfill and Regrade MR-171 Drill Pads DOZER 1 27.63 $9,562 <br /> 058 Backfill and Regrade B Seam Dewatering System DOZER 1 0.66 $230 <br /> Pond 5 <br /> 059 Replace Topsoil at B Seam Dewatering System#2 DOZER 1 0.12 $41 <br /> Pond 5 <br /> 060 Regrade Pond RP-1 Area DOZER 4 0.76 $1,054 <br /> 061 Regrade Pond RP-2/3 Area DOZER 4 1.96 $2,714 <br /> 062 Regrade Pond RP-4 Area DOZER 4 2.08 $2,877 <br /> 063 Regrade Pond RP-5a Area DOZER 4 1.41 $1,947 <br /> 064 Regrade TS#2 Sediment Pond DOZER 4 0.05 $63 <br /> 065 Remove Scullion Gulch Check Dams TRUCKl 1 3.75 $1,900 <br /> 066 Regrade B-Seam Dewatering System#1 Pond DOZER 2 8.23 $5,698 <br /> Area <br /> 067 Regrade B-Seam Dewatering System#2 DOZER 4 4.27 $5,907 <br /> 068 Backfill SDH-3 Dewatering Treatment System DOZER 1 1.97 $700 <br /> 069 Replace Topsoil to SDH-3 Dewatering Treatment DOZER 1 1.50 $531 <br /> System <br /> 070 Replace Topsoil from Stockpile to D-Portal Area SCRAPERl 3 29.30 $104,764 <br /> 071 Replace Topsoil from Stockpile to East and West SCRAPERl 3 22.15 $79,195 <br /> Haulroads <br /> 072 Replace Topsoil from Stockpile to RP-2/3/4/5a SCRAPERl 3 140.63 $502,840 <br /> 073 Replace Topsoil from Stockpile to RP-1 SCRAPERl 3 13.78 $49,285 <br /> 075 Replace Topsoil from Stockpile to Slot Storage SCRAPERl 3 1.57 $5,611 <br /> Area <br /> 076 Replace Topsoil from Stockpile to Alluvial Well SCRAPERl 3 0.45 $1,609 <br /> Area <br /> 077 Replace Topsoil from Stockpile to Overland SCRAPERl 3 7.45 $26,629 <br /> Conveyor Corridor <br /> 080 Load/Place Topsoil from D-Portal to East Portal TRUCKl 1 3.98 $3,434 <br /> Vent Shaft <br /> 081 Replace Topsoil on Drill Pads and Access Roads DOZER 1 10.16 $3,516 <br /> MR171 <br /> 082 Replace Topsoil from Stockpile to Access Roads DOZER 4 3.38 $4,677 <br /> 083 Replace Topsoil from Stockpile to Pond RP-5a DOZER 4 2.72 $3,761 <br /> 084 Replace Topsoil from Stockpile to Drill Pads, DOZER 4 22.91 $31,709 <br /> Ponds,Ditches <br /> 085 Replace Topsoil from Stockpile to Rock Dust DOZER 4 0.20 $270 <br /> Facility <br /> 086 Replace Topsoil from Stockpile to Pond,Road,and DOZER 4 0.53 $731 <br /> Laydown <br /> 087 Replace Topsoil from Stockpile to B-Seam Vent SCRAPERl 3 0.62 $2,205 <br /> Shaft and Road <br /> 088 Replace Topsoil from Stockpile to Light Use Road DOZER 4 0.17 $230 <br /> to RDH-3 <br /> 089 Replace Topsoil from Stockpile to B-Seam DOZER 4 0.50 $692 <br /> Dewatering Area#1 <br /> 090 Topsoil Replacement of the Upper Pond B Seam DOZER 1 13.46 $4,676 <br /> #2 System <br /> 092 Plug and Seal 14 geotechi&al holes BOREHOLE 1 0.00 $1,742 <br /> 093 Plug and Seal RS-13L BOREHOLE 1 8.00 $1,196 <br /> 094 Seal Portals and Vent Shafts MINESEAL 1 160.00 $233,564 <br /> 095 Seal and Abandon MR-171 Boreholes BOREHOLE 1 10.00 $3,631 <br /> 096 Plug and Seal All Boreholes BOREHOLE 1 512.00 $277,317 <br /> CIRCES Cost Estimating Software <br />