Laserfiche WebLink
Bulldozer Worksheet Cont'd Task#058 Page 1 of 2 <br /> BULLDOZER WORK <br /> Task description: Backfill and Regrade B Seam Dewatering System Pond 5 <br /> Site: Deserado Mine Permit Action: 2022 Midterm Review Permit/Job#: C1981018 <br /> PROJECT IDENTIFICATION <br /> Task#: 058 State: Colorado Abbreviation: None <br /> Date: 11/10/2022 County: Moffat Filename: C018-058 <br /> User: CCW <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D9T-9SU <br /> Horsepower: 405 <br /> Blade Type: Semi-Universal <br /> Attachment: 3-shank ripper <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $146.30 NA <br /> Operating Cost/Hour: $141.41 100 <br /> Ripper own. $17.01 NA <br /> Cost/Hour: <br /> Ripper op. Cost/Hour: $1.33 15 <br /> Operator Cost/Hour: $41.30 NA <br /> Total unit Cost/Hour: $347.35 <br /> Total Fleet Cost/Hour: $347.35 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 380 <br /> Swell factor: 1.250 <br /> Loose volume: 475 LCY <br /> Source of estimated volume: Division of Reclamation,Mining& Safety <br /> Source of estimated swell Cat Handbook <br /> factor: <br /> HOURLY PRODUCTION <br /> Average push distance: 50 feet <br /> Unadjusted hourly 2,110.5 LCY/hr <br /> production: <br /> Materials consistency description: Compacted fill or embankment 0.9 <br /> Average push 0% <br /> gradient: <br /> Average site altitude: 5,600 feet <br /> Material weight: 2,650 lbs/LCY <br /> Weight description: Decomposed rock-25%Rock,75%Earth <br /> Job Condition Correction Factor Source <br />