Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task#042 Page 4 of 4 <br /> Haul Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> (min) <br /> 1 2000.00 -3.00 3.00 0.00 4254 0.945 <br /> Haul Time: 0.945 minutes <br /> Return Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 2000.00 3.00 3.00 6.00 2851 0.929 <br /> Return Time: 0.929 minutes <br /> Total Truck Cycle Time: 5.074 minutes <br /> Loading Tool unit <br /> Production 715.91 LCY/Hour Adjusted for job efficiency: 594.20 LCY/Hour <br /> Truck Unit Production <br /> 310.41 LCY/Hour Adjusted for job efficiency: 257.64 LCY/Hour <br /> Optimal No. of Trucks: 2 Truck(s) Selected Number of Trucks: 2 Truck(s) <br /> Adjusted hourly truck team production: 515.27 LCY/Hour <br /> Adjusted single truck/loader team production: 515.27 LCY/Hour <br /> Adjusted multiple truck/loader team production: 515.27 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 7.12 Hours <br /> Unit cost: $0.989 /LCY Total job cost: $3,630 <br /> CIRCES Cost Estimating Software <br />