Laserfiche WebLink
Scraper Worksheet Cont'd Task#025A Page 1 of 2 <br /> SCRAPER TEAM WORK <br /> Task description: Cover RP2/3/4/5a with Subsoil <br /> Site: Deserado Mine Permit Action: 2022 Midterm Review Permit/Job#: C1981018 <br /> PROJECT IDENTIFICATION <br /> Task#: 025A State: Colorado Abbreviation: None <br /> Date: 11/9/2022 County: Rio Blanco Filename: C018-025a <br /> User: CCW <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShiftbasis: 1 per day <br /> Equipment Description <br /> -Scraper: Cat 637G w/push-pull <br /> -Dozer: NA <br /> Support Equipment-Load Area: NA <br /> -Dump Area: NA <br /> Road Maintenance—Motor Grader: NA <br /> -Water Truck: NA <br /> Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 NA NA NA NA NA <br /> Ownership cost/hour: $287.19 NA NA NA NA NA <br /> Operating cost/hour: $277.83 NA NA NA NA NA <br /> %Utilization-ripper: NA NA NA NA NA NA <br /> Ripper own. cost/hour: NA NA NA NA NA NA <br /> Ripper op. cost/hour: NA NA NA NA NA NA <br /> Operator cost/hour: $30.90 NA NA NA NA NA <br /> Unit Subtotals: $595.92 NA NA NA NA NA <br /> Number of Units: 6 0 0 0 0 0 <br /> Group Subtotals: Work: $3,575.52 Support: $0.00 Maine $0.00 <br /> Total work team cost/hour: $3,575.52 <br /> MATERIAL QUANTITIES <br /> Initial volume: 226,931 CCY Swell factor: 1.111 <br /> Loose volume: 252,120 LCY <br /> Source of estimated volume: C-1981-018 Permit Volume IV <br /> Source of estimated swell factor: Operator Study <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 2,743 lbs/LCY Struck Volume: 24.00 LCY <br /> Material description: User Provided Heaped Volume: 34.00 LCY <br /> Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br /> Payload Capacity: 29.75 LCY Adjusted Capacity: 29.00 LCY <br /> CIRCES Cost Estimating Software <br />