Laserfiche WebLink
Scraper Worksheet Cont'd Task#010 Page 1 of 2 <br /> SCRAPER TEAM WORK <br /> Task description: Recontouring the Haul Road/County Road 65 Intersection <br /> Site: Deserado Mine Permit Action: 2022 Midterm Review Permit/Job#: C1981018 <br /> PROJECT IDENTIFICATION <br /> Task#: 010 State: Colorado Abbreviation: None <br /> Date: 11/9/2022 County: Moffat Filename: C018-010 <br /> User: CCW <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShiftbasis: I per day <br /> Equipment Description <br /> -Scraper: Cat 637G <br /> -Dozer: NA <br /> Support Equipment-Load Area: NA <br /> -Dump Area: NA <br /> Road Maintenance—Motor Grader: NA <br /> -Water Truck: NA <br /> Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 NA NA NA NA NA <br /> Ownership cost/hour: $264.49 NA NA NA NA NA <br /> Operating cost/hour: $296.10 NA NA NA NA NA <br /> %Utilization-ripper: NA NA NA NA NA NA <br /> Ripper own. cost/hour: NA NA NA NA NA NA <br /> Ripper op. cost/hour: NA NA NA NA NA NA <br /> Operator cost/hour: $30.90 NA NA NA NA NA <br /> Unit Subtotals: $591.49 NA NA NA NA NA <br /> Number of Units: 1 0 0 0 0 0 <br /> Group Subtotals: Work: $591.49 Support: $0.00 Maint: $0.00 <br /> Total work team cost/hour: $591.49 <br /> MATERIAL QUANTITIES <br /> Initial volume: 3,900 CCY Swell factor: 1.060 <br /> Loose volume: 4,134 LCY <br /> Source of estimated volume: Division of Reclamation,Mining& Safety <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 3,250 lbs/LCY Struck Volume: 24.00 LCY <br /> Material description: Gravel-Pitrun Heaped Volume: 34.00 LCY <br /> Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br /> Payload Capacity: 25.11 LCY Adjusted Capacity: 25.11 LCY <br /> CIRCES Cost Estimating Software <br />