My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-12-21_REVISION - C1981018
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2022-12-21_REVISION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2022 6:43:45 AM
Creation date
12/22/2022 5:55:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
12/21/2022
Doc Name Note
Midterm Review & Cost Estimate
Doc Name
Midterm Review Document
From
DRMS
To
Blue Mountain Energy, Inc
Type & Sequence
MT8
Email Name
CCW
THM
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task#002 Page 2 of 2 <br /> Material consistency: 0.900 (CAT HB)) <br /> Dozing method: 1.000 (GEN.) <br /> Visibility: 1.000 (AVG.) <br /> Job efficiency: 0.830 (1 SHIFT/DAY) <br /> Spoil pile: 1.000 (DOZ-OC) <br /> Push gradient: 1.000 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 0.838 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.5634 <br /> Adjusted unit 307.62 LCY/hr <br /> production: <br /> Adjusted fleet 1230.48 LCY/hr <br /> production: <br /> JOB TIME AND COST <br /> Fleet size: 4 Dozer(s) <br /> Unit cost: $1.125/LCY <br /> Total job time: 145.14 Hours <br /> Total job cost: S200,888 <br />
The URL can be used to link to this page
Your browser does not support the video tag.