My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-12-21_REVISION - C1981018
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2022-12-21_REVISION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2022 6:43:45 AM
Creation date
12/22/2022 5:55:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
12/21/2022
Doc Name Note
Midterm Review & Cost Estimate
Doc Name
Midterm Review Document
From
DRMS
To
Blue Mountain Energy, Inc
Type & Sequence
MT8
Email Name
CCW
THM
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont'd Task#001 Page 2 of 2 <br /> Cycle Time: <br /> Scraper Loading Time: 1.00 Minutes <br /> Maneuver and Spread Time: 0.60 Minutes <br /> Job Condition Correction: Site Altitude: 5300 feet <br /> Scraper Push Dozer Source <br /> Altitude Adj: 1.000 NA (CAT HB) <br /> Job Efficiency: 0.830 NA (CAT HB) <br /> Net Correction: 0.830 NA <br /> Travel Time: <br /> Road Condition: Firm, smooth,rolling,dirt/It. surfaced,watered,maintained 3.0 <br /> Haul Route: <br /> Seg# Haul Distance(Ft) Grade Roll.Res Total Res Velocity Travel Time <br /> (%) (%) (%) (fpm) (min) <br /> 1 900.00 4.00 3.00 7.00 1362 0.74 <br /> Haul Time: 0.74 minutes <br /> Return Route: <br /> Seg# Haul Distance(Ft) Grade Roll.Res Total Res Velocity Travel Time <br /> (%) (%) (%) (f m) (min) <br /> 1 900.00 -4.00 3.00 -1.00 2972 0.37 <br /> Return Time: 0.37 minutes <br /> Total Scraper team cycle time: 2.71 minutes <br /> Adjusted for job conditions: 1,065.83 LCY/Hour <br /> Selected Number of Scrapers: 2 Scraper(s) <br /> Adjusted single scraper team(unit)hourly production: 1,065.83 LCY/Hour <br /> Adjusted multiple scraper team(fleet)hourly production: 3,197.49 LCY/Hour <br /> Unadjusted unit production/hour: 1,284.13 LCY/Hour <br /> Optimal Number of Scrapers per push dozer: <br /> JOB TIME AND COST <br /> Fleet size: 3 Team(s) Total job time: 83.39 Hours <br /> Unit cost: $1.118 /LCY Total job cost: $298,164 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.