My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-12-20_PERMIT FILE - P2022019
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2022019
>
2022-12-20_PERMIT FILE - P2022019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2023 2:20:08 PM
Creation date
12/21/2022 8:18:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2022019
IBM Index Class Name
Permit File
Doc Date
12/20/2022
Doc Name
Application
From
Sunrise Minerals Inc
To
DRMS
Email Name
DMC
THM
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Summary <br />Total road disturbance is .52 acres. <br />Total drill pad disturbance is .45 acres. <br />Total plan view disturbance is 0.97 acres. <br />Description ID <br />Code <br />Underlying <br />Ground <br />Slope <br />Ungraded <br />Slope <br />Cut <br />Slope <br />Road + <br />Drill Pad <br />Length <br />Road <br />Width <br />Number <br />of Drill <br />Pads <br />Individual <br />Sump <br />Volume <br />Drill <br />Pad <br />Width <br />Drill <br />Pad <br />Length Grading Fleet <br />Slope <br />Replacement <br />Percent <br />-1 % grade _H:1V degrees ft ft cy ft ft % <br />0 Laydown Yard 5.0 1.3 60.0 100 12.0 1 0 75.0 100 Sm Dozer 100 <br />1 Drill Pads 5.0 1.3 60.0 225 12.0 3 12 50.0 75 Sm Dozer 100 <br />2 <br />3 Overland Travel to Site #8 15.0 1.3 60.0 110 14.0 0 0 0.0 0 Sm Dozer 100 <br />4 Proposed Road to Site #11 15.0 1.3 60.0 50 14.0 0 0 0.0 0 Sm Dozer 100 <br />5 <br />6 Improved Road 15% 15.0 1.3 60.0 1,110 12.0 0 0 0.0 0 Sm Dozer 100 <br />7 Improved Road 10% 10.0 1.3 60.0 110 12.0 0 0 0.0 0 Sm Dozer 100 <br />8 Improved Road 5% 5.0 1.3 60.0 240 12.0 0 0 0.0 0 Sm Dozer 100 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />Notes: <br />Laydown yard near junction with W19, underlying ground slope estimated at 5%. <br />Drill pads are all in relatively flat areas. Estimated underlying ground slope is 5%. <br />Proposed road underlying ground slope estimated at 15%. Improved road underlying ground slope estimated between 5 and 15% <br />Calculation <br />Description ID <br />Code <br />Ungraded <br />Slope <br />Cut <br />Slope <br />Road Plan <br />View Width <br />Road Net <br />Length <br />Road <br />Disturbanc <br />e <br />Drill Pad <br />Plan View <br />Width <br />Drill Pad <br />Length <br />Drill Pad <br />Disturbanc <br />e <br />-1 _H:1V degrees (ft) (ft) (acres) (ft) (ft) (acres) <br />0 Laydown Yard 1.30 60.00 12.60 0 0.00 78.72 100 0.18 <br />1 Drill Pads 1.30 60.00 12.60 0 0.00 52.48 225 0.27 <br />2 <br />3 Overland Travel to Site #8 1.30 60.00 16.36 110 0.04 0.00 0 0.00 <br />4 Proposed Road to Site #11 1.30 60.00 16.36 50 0.02 0.00 0 0.00 <br />5 <br />6 Improved Road 15% 1.30 60.00 14.02 1,110 0.36 0.00 0 0.00 <br />7 Improved Road 10% 1.30 60.00 13.26 110 0.03 0.00 0 0.00 <br />8 Improved Road 5% 1.30 60.00 12.60 240 0.07 0.00 0 0.00 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14
The URL can be used to link to this page
Your browser does not support the video tag.