Laserfiche WebLink
Morton Lakes Substitute Water Supply Plan Renewal Page 7 of 9 <br /> December 16, 2022 <br /> 6. The total water used for construction of the slurry wall at Stage 7A shall not exceed 16.11 acre- <br /> feet. <br /> 7. The total water used for storage (re-fill) of Stage 2 will not exceed 80 acre-feet. <br /> 8. The total consumptive use under this SWSP shall not exceed 290.68 acre-feet and the total lagged <br /> depletions shall not exceed 292.36 acre-feet. <br /> 9. Total consumption and lagged depletions at the Morton-Holton Lakes site must not exceed these <br /> aforementioned amounts unless an amendment is made to this SWSP. <br /> 10. Approval of this SWSP is for the purposes as stated herein. This office must first approve any <br /> additional uses for the water. <br /> 11. All pumping for dust control shall be measured in a manner acceptable to the Division Engineer. <br /> 12. The replacement water that is the subject of this SWSP cannot be sold or leased to any other entity. <br /> As a condition of subsequent renewals of this SWSP, the replacement water must be appurtenant to <br /> this site until a plan for augmentation is obtained. All replacement water must be concurrent with <br /> depletions in quantity, timing, and locations. <br /> 13. The Applicant shall provide daily accounting (including, but not limited to diversions, depletions, <br /> replacement sources, and river calls) on a monthly basis. The accounting must be uploaded to the <br /> CDSS Online Reporting Tool within 30 days of the end of the month for which the accounting applies <br /> (https://dwr.state.co.us/Tools/reporting). Instructions for using the tool are available on the <br /> Division of Water Resources website on the "Services" —> "Data St Information" page under the <br /> heading of Online Data Submittal. Accounting and reporting procedures are subject to approval and <br /> modification by the Division Engineer. Accounting forms need to identify the WDID number for each <br /> structure operating under this SWSP. Additional information regarding accounting requirements can <br /> be found in the attached Augmentation Plan Accounting Protocol. NOTE: Monthly accounting, even <br /> during the winter non-irrigation season, is required. <br /> In addition, the Applicant shall verify that the entity making replacements has included the <br /> Applicant on their accounting and submitted their accounting to the division office and the Water <br /> Commissioner; for this SWSP, that entity is the City of Aurora. <br /> 14. Conveyance loss for delivery of augmentation water to the point of depletion on the South Platte <br /> River is subject to assessment and modification as determined by the Division Engineer. <br /> 15. In order to prevent injury to other water rights, the Division Engineer and Water Commissioner must <br /> be able to administer Applicants' replacement water past headgates on the river at times when <br /> those headgates would otherwise be legally entitled to divert all available flow in or "sweep" the <br /> South Platte or its tributaries. Applicant shall not receive credit for replacement of depletions to <br /> the South Platte below such diversion structures unless bypass and measurement structures are in <br /> place to allow the Division Engineer and Water Commissioner to confirm that Applicant's <br /> replacement water is delivered past the headgates. In the event that delivery past dry-up points <br /> requires the use of a structure for which a carriage or use agreement with a third party is required, <br /> Applicant shall be responsible for securing such agreement. Until such time as the Applicant <br /> provides a copy of the carriage or use agreement to the Division Engineer and Water Commissioner, <br /> no credit will be allowed for replacement of depletions to the South Platte below such diversion <br />