Laserfiche WebLink
Morton Lakes Substitute Water Supply Plan Renewal Page 5 of 9 <br /> December 16, 2022 <br /> 0 1,395 feet for Stage 5 <br /> 0 8,557 feet for Stage 6A <br /> 0 8,680 feet for Stage 6B <br /> 0 9,164 feet for Stage 6C/6D <br /> 0 8,014 feet for Stage 6E <br /> 0 6,978 feet for Stage 7A <br /> Normalized lagged factors were developed to determine the timing of lagged depletions to the stream as <br /> summarized in the table below: <br /> Depiction Lagging Factors <br /> Stage 1 Depletion Stagt 2 Depletion Stage 6A Stage 6B Stage 6C/6D Stage 6E Stage 7A <br /> Lagging Factors Lagging Factors Depletion Depletion Dcplclion Depletion Dcplcliun <br /> Lagging Factors Lagging Factors Lagging Factors Lagging Factors Lagging Factors <br /> Lagging Lagging Lagging Lagging i Lagging Lagging <br /> Month Factor Month Factor Month Month Month Factor Factor Month Factor Month Factor <br /> 1 0.8590 1 04685 1 1 1 0.2986 1 0,6541 1 0 A 5 3 5 1 0.8274 <br /> 2 0.1040 2 0.2647 2 2 2 0.2921 2 0.2023 2 0.2701 2 0.0610 <br /> 3 0.0196 3 0.0712 3 3 3 0.0992 3 0.0449 3 0.0736 0.0318 <br /> 4 00108 4 0.0401 4 4 4 0.0542 4 0.0242 4 i 0.0334 4 0.0203 <br /> 5 0.0077 5 0.0292 5 5 5 0.0369 5 0.0168 5 0.0279 5 0.0165 <br /> 6 0.0238 6 6 6 0.0287 6 0,0134 6 I 0,0221 (, 0.0132 <br /> 7 0.0202 7 7 7 0.0240 7 0.0114 7 0.0187 7 0.0117 <br /> 8 0,0174 8 8 8 0.0210 8 0.0099 8 0.0163 8 0.0100 <br /> 9 0.0150 9 9 9 0.0187 9 0.0096 9 0.0144 9 0.0082 <br /> 10 0.0130 10 10 10 0.0168 10 0.0077 10 0.0127 <br /> 11 0,0113 11 11 11 0.0151 11 0.0067 11 i 0.0114 <br /> 12 0.0097 12 0.0109 12 0.0137 12 0.0101 <br /> 13 0.0085 13 0.0099 13 0.0124 13 j 0.0089 <br /> 14 0,0073 14 0.0089 14 0.0112 14 i 0.0080 <br /> 15 0.0080 15 0.0101 15 0.0070 <br /> 16 0.0072 16 0.0092 16 1 0.0063 <br /> 17 0.0065 17 0.0083 17 0.0056 <br /> 18 0.0059 18 0.0075 <br /> 19 0.0053 19 0.0068 <br /> I <br /> 20 0.0061 <br /> 21 0.0056 <br /> 22 0.0050 <br /> 10CAL 1.0000 rnra.L 1.0000 TOTAL 1.0000 TOTAL 1.0000 TOTAL. 1.0000 TOTAL 1.0000 TOTAL 1.0000 <br /> The total projected lagged depletions from mining operations are 292.36 acre-feet during 2023 as shown <br /> in Table 2, Column 10. For purposes of this SWSP depletions are assumed to accrue to a point on the South <br /> Platte River located 1,885 feet from the West Section line and 1,600 feet from the South Section line in <br /> Section 6, Township 1 North, Range 66 West, 6th P.M. <br /> Replacements <br /> The proposed source of replacement water for this SWSP is fully consumable water leased from the City of <br /> Aurora ("Aurora"). The Applicant provided a copy of the lease extension agreement with Aurora renewable <br /> through December 31, 2023 with the SWSP request, and a copy of the lease is attached to this letter. Water <br /> leased from Aurora would be released from the Robert W. Hite Treatment Facility (a.k.a. Metro <br /> Wastewater Treatment Plant (MWWTP)) (WDID 0200700) in the SW'/a of the SW'/a of Section 1, Township 3 <br /> South, Range 68 West of the 6th P.M. A transit loss of 0.5% per mile is currently assessed from April through <br /> October and a transit loss of 0.25% per mile is currently assessed during November through March for <br />