My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-12-19_INSPECTION - C1981019
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981019
>
2022-12-19_INSPECTION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2022 10:53:53 AM
Creation date
12/19/2022 10:31:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Inspection
Doc Date
12/19/2022
Doc Name
Inspection Report
From
DRMS
To
Colowyo Coal Company LP
Inspection Date
12/14/2022
Email Name
ZTT
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENFORCEMENT ACTIONS/COMPLIANCE <br /> Infraction Number: CV2022001 <br /> Inspection Date: October 4,2022 <br /> Date Issued: October 12,2022 <br /> Primary Topic: Hydrologic Balance <br /> Secondary Topic: Off-site Damage <br /> Tertiary Topic: <br /> Description: Failure to construct permanent post-mining drainage channels and temporary <br /> channels in accordance with the approved reclamation plan. <br /> Abatement#: 1 <br /> Abatement Due Date: 1/10/2023 <br /> Abatement Due Extended Date: <br /> Abatement Date: <br /> Abatement Description: Clean sediment transported offsite and repair both the Final East Pit <br /> Ditch and South Collection Ditch to fix erosion problems that have occurred,including the necessary <br /> riprap,to ensure runoff safely flows to the Prospect Pond as currently designed. <br /> Abatement#: 2 <br /> Abatement Due Date: 1/10/2023 <br /> Abatement Due Extended Date: <br /> Abatement Date: <br /> Abatement Description: Submit to the Division a complete Technical Revision providing a new <br /> design for the Final East Pit Ditch that would safely pass the peak runoff resulting from a 10-year,24- <br /> hour precipitation event which would not contribute to adverse impacts to the hydrologic balance in the <br /> mine and associated offsite areas. <br /> The Division has currently received and reviewing the Colowyo Mine Technical Revision No. 158.This <br /> revision is proposing to redesign the Prospect watershed and Final East Pit Ditch in association with the <br /> abatement process of CV2022001. <br />
The URL can be used to link to this page
Your browser does not support the video tag.