Stiles Mining Resource <br /> Groundwater Monitoring and Mitigation Plan <br /> December 2022 <br /> Page 8 <br /> 4.3 GROUNDWATER LEVEL DATA EVALUATION AND REPORTING <br /> ASCI will compare monthly post-operational groundwater levels against the baseline groundwater <br /> level data for each well within two (2) weeks of collection to aid in determining if any potential <br /> adverse impacts to off-site wells has occurred. The primary triggers for determining potential <br /> adverse off-site impacts to groundwater levels in nearby wells will be if post-operational <br /> groundwater level(s)drop to half of the baseline groundwater level(s)in one(1)or more of the up- <br /> gradient wells(MW-1 through MW-3), in MW-7,or if ASCI is contacted with a complaint. ASCI <br /> will report groundwater level data in a groundwater monitoring report that will be submitted to <br /> DBMS as supplemental information with the annual report for the mine each year. <br /> 4.4 MITIGATION MEASURES FOR GROUNDWATER LEVEL IMPACTS <br /> 4.4.1 Collect Groundwater Levels in Nearby Well(s) <br /> Should groundwater elevation drop below half of the baseline level in one or more of the up- <br /> gradient monitoring wells (MW-1 through MW-3), in MW-7, or if ASCI is contacted with a <br /> complaint,ASCI will contact owner(s)of potentially impacted nearby well(s)to inquire about any <br /> issues and/or to assess the groundwater level conditions in the well(s), as applicable. ASCI will <br /> collect groundwater level measurement(s) in the nearby well(s)if allowed by the well owner(s). <br /> ■ If groundwater level(s)in nearby well(s) do not indicate a potential adverse impact due to <br /> the mining operation,ASCI will continue with the current groundwater level monitoring <br /> schedule. <br /> ■ If groundwater level(s) in nearby well(s)do indicate a potential adverse impact due to the <br /> mining operation,ASCI will begin review of the existing data set as detailed in Section <br /> 4.4.2. <br /> 4.4.2 Evaluation of Existing Data Set <br /> If groundwater level measurement(s) on nearby well(s) indicate a potential adverse impact or if <br /> ASCI is denied permission to collect a groundwater measurement after being contacted with a <br /> complaint, ASCI will evaluate the existing data set (i.e., most recent and historic measurements, <br /> potentiometric flow maps, etc.) within fourteen(14)days to try and determine if adverse impacts <br /> are potentially sourced from pumping at the mine.Data will specifically be compared with the pre- <br /> operational and post-operational groundwater elevation data set for the Site and nearby well(s), as <br /> available, to determine any groundwater elevation trends. If appropriate, ASCI will collect <br /> groundwater levels from on-site and off-site wells to evaluate current groundwater level conditions <br /> in a single measurement event. <br /> ■ If off-site groundwater level impacts are not potentially attributable to the mining <br /> operation, ASCI will continue with the current groundwater level monitoring schedule. <br /> ■ If off-site groundwater level impacts are potentially attributable to the mining operation, <br /> ASCI will discuss corrective action measures available with the impacted well owner. <br />