i) Creating usable property for agriculture use. <br /> ii) Increasing the visual attractiveness of the site and surrounding area. <br /> iii) Providing private entities with inert fill alternatives. <br /> iv) Revenue to the City of Evans and the State in future taxes from industrial companies that <br /> will locate to the site. <br /> v) Increased employment opportunities created by the development of the inert filling <br /> operations and reclamation of this site. <br /> f) No contaminated materials will be allowed on or accepted at the site. <br /> g) Asphalt and concrete materials are considered an inert material and will not be incorporated <br /> into the mine backfill. <br /> i) ASCI will be diverted waste asphalt and concrete materials to the one site recycled <br /> aggregate materials operation for processing, resale, or incorporation as a component of <br /> our hot asphalt mixes. <br /> Stiles Mining Resource Mine Phase <br /> Mine Excavation and Backfill Reclamation <br /> Schedule <br /> Stripe,stockpile Backfill ±Mine Buffer Reclamation Final <br /> Mine Mine Cessation Weed <br /> and seed topsoil Start clean Place Seeding& Reclamation <br /> & den <br /> Phase sand& to Inert Control <br /> DESCRIPTION•See Schedule Graph Phase Mine Affected stock pi stock <br /> plies gravel Backfill inert material Backfill & Topsoil Weed Phase <br /> Control Release <br /> Area Complete Seeding <br /> (Acres) Complete Final ±Years <br /> Start Year Complete Year Yrs Start Year <br /> Year Year 55 <br /> Commercial Phase 1(West Parcel III& <br /> 2.4 2023 2023 2045 2645 NA 2023 2045 2045 2049 4 <br /> 1)Backfill washplant pond system. <br /> Mine Phase 2(West Survey Parcel III) 2 21.8 2023 2029 2024 2032 3.00 2023 2C32 2034 2036 4 <br /> Mine Phase 3(Middle Survey Parcel 1) 3 24.6 2026 2032 2027 2036 4.00 2C23 2C36 2038 2041 5 <br /> Mine Phase 4(East Survey Parcel 11) 4 23.6 2033 2039 2034 2042 3.00 2023 2C42 2044 2047 5 <br /> rAine Phase 5(Fast Survey Parcel II) 1 5 15.2 2040 2044 2041 204E 2Cd8 2050 2052 4 <br /> Mine and Backfill Surface Area(Acres) 87.6 <br /> Commercial Area including buffers&settling <br /> 39.0 <br /> excluding settling ponds(Acres) <br /> Mine buffers excluding commercial buffers <br /> 25.7 <br /> (Acres` <br /> Total Affected Area(Acres) 152.3 <br /> NOTES: <br /> 1) The phased reclamation plan allows for excavation and mining to take place on a maximum of 25 acres. Grading of topsoil,soil amendments and <br /> reclamation seeding will follow and may impact a maximum of 50 acres. <br /> 2) Placement and grading top soil,top soil testing,soil amendments and reclamation seeding will follow release of the mine and backfill operations <br /> bonding. <br /> 3) Phase 1-Commercial reclamation bond should beheld for duration of the mining project. The only excavation in phase 1 is striping and stockpiling <br /> of some top soil,excavation of the wash plant settling ponds±2.4 Acres,and wash plant ditches. No other mining will occur in Phase 1. Total <br /> Commercial Affected Area(Phase 1)is 41.5 acres and includes the ditch buffer,settling ponds,truck scales,office,asphalt hot pfant and aggregate <br /> wash plant. <br /> 4) The phase 1 commercial area reclamation bond should be maintained for the duration of the project. The 2.4 acres settling pond excavation is not <br /> included in the 25 acre maximum excavation and backfill commitment <br /> 5) For the mining and back-fill portion of the reclamation bond;for phases 2 through 5,the maximum mining and backfill operation disturbance area is <br /> 25 acres.Two phases of mining and back-fill may be disturbed at the same time,provided the total area is equal to or less than 25 acres. <br />