Laserfiche WebLink
Stiles Mining Resource Mine Phase Schedule Mine;Excavation and Backfill <br /> Stripe,stockpile and seed Mine Backfill <br /> topsoil g overbuden stock Yr. sand& Start lean inert <br /> Mine <br /> Mine Phase piles gravel Backfill rhaterial <br /> DESCRIPTIOIJ-See Schedule Graph Phase Affected Area <br /> (Acres] <br /> Start Year Complete Year <br /> Commercial Phase 1(West Parcel III&1) 2.= 2G23 21 2023 2045 2C=5 <br /> Mine Phase 2(West Survey Parcel III) 2 21.8 2222 3.3 202E 2w2L 2028 <br /> Mine Phase 3(Middle Survey Parcel 1) 3 24.6 2226 5.5 2C33 2027 203E <br /> Mine Phase 4(East Survey Parcel 11) 4 23.6 2233 E.3 2 LC 2035 2042 <br /> Mine Phase 5(East Survey Parcef II) 5 15.2 22=3 Z 22t' 24L1 2CL5 <br /> Mrne and Backfill Surface Area(Acres) 97.6 <br /> Commercial Area including buffers&settling <br /> excluding settling ponds(Acres) <br /> Mine buffers excluding commercial buffers <br /> (Acres) 25.7 <br /> Total Affected Arco(Acres) 152.3 <br /> NOTES: <br /> 1) City of Evans-35th Avenue Right of Way is 120 ft in widtft No mining will take place in this right of <br /> wayand this area is not included in the affected area. <br /> 2) Total Property and Affected Area excluding the City of Evans avenue RCMP is t152.3 Acres. <br /> 3) Phase 1-Commercial reclamation bond should be held for duration of the mining project. The only <br /> excavation in phase 1 is striping and stockpiling of some top soil,excavation of the wash plant settling <br /> ponds t2A Acres,and wash plant ditches. No other mining+rail!occur in Phase 1. Total Commercial <br /> Affected Area(Phase 1)is 41.5 acres and includes the ditch buffer.settling ponds,truck scales,office, <br /> asphalt hot plant and aggregate wash plant <br /> 4) The phase 1 commercial area reclamation bond should be maintained for the duration of the <br /> project. The 2A acres settling pond excavation is not included in the 25 acre maximum excavation and <br /> backfill commitment. <br /> 5) For the mining and backfi It portion of the reclamation bond;for phases 2 through 5,the maximum <br /> mining and backfill operation disturbance area is 25 acres.Two phases of mining and backfill maybe <br /> disturbed at the same time,provided the total area is equal to or less than 25 acres. <br /> 5. Equipment-The aggregate material will be mined using, but not limited to the following <br /> equipment. <br /> a. Earth moving equipment—Dozers, loaders, excavators, articulated haul trucks, water <br /> truck and possibly scrapers will be used for the mining and earth moving operations. <br /> b. Processing Equipment—Feeders, screens,jaw, cone, and impact crushers; screening <br /> plant, log washer, sand screw,wet plant, conveyors, stackers, and other miscellaneous <br /> processing equipment. All aggregate crushing/screening equipment is mobile for <br /> relocation in the mine. <br />