My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-10-26_PERMIT FILE - C1981041
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981041
>
2022-10-26_PERMIT FILE - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2022 9:05:21 AM
Creation date
12/13/2022 9:01:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Permit File
Doc Date
10/26/2022
Section_Exhibit Name
Tab 10 Vegetation Information
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 2.6 SPECIES DIVERSITY <br />Species/lifeform diversity was calculated for each study area by deter- <br />mining the number of species having a relative cover exceeding 3 percent and <br />grouping these by lifeform. <br />2.7 TIME OF SAMPLING <br />All quantitative data were collected from July 26-31, 1982. <br />2.8 AGENCY COORDINATION <br />Powderhorn Coal Company on 9 July 1982 submitted a plan detailing <br />sample procedures and methodology for conducting the vegetation inventory. <br />On 22 July 1982 Mr. Jim Herron, Reclamation Specialist, Colorado Mined <br />Land Reclamation, modified the vegetation plan. <br />This study has followed that modified plan except that 111 total vegetation <br />cover contrasted to herbaceous cover was determined; 12) shrub density <br />was determined by counting all individuals present, not just those greater <br />than 0.5 meters in height. These minor changes were approved by Mr. Dan <br />Matthews of Colorado Mined Land Reclamation during a telephone conversa- <br />tion with Mr. David L. Johnson of Western Resource Development on 27 July <br />• 1982. <br />Per Colorado Mined Land Reclamation direction, sample adequacy for <br />cover, production, and density was calculatetl per the following formula: <br />t' s° <br />M = (-Sc d~ <br />where M =the minimum number of observations needed <br />t =the two-tailed t distribution value at the 90X, confidence <br />level 11.64) or the BOb confidence level !1.281 <br />sZ = the variance estimate obtained from sampling <br />d =the level of accuracy desired for the estimate of the mean 10.1) <br />x =the sample mean <br /> <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.