Laserfiche WebLink
xi <br /> <br />13C Northwest Intake Portal - Post Mining Topography 5 14 <br />6D Roadside South Portal (January 20, 1977 Contours) 5 14 <br />8D Roadside North Portal (May, 1977 Contours) 5 14 <br />11D Unit Train Loadout Facility (January 20, 1977 Contours) 5 14 <br />13 Surface Geology 2 6 <br />14 General Geologic Cross Section - Roadside Mine Area 2 6 <br />15 Structural Contour Map - Top of Cameo “B” Seam 2 6 <br />16 Coal Geology - Cross Section 2 6 <br />17 Surface Water Hydrology 2 7 <br />18 Cameo Refuse Disposal Area - Cross Sections 4 13 <br />19 Drainage Crossing Dip Section Detail 4 13 <br />20 Sedimentation Control Plan - Details and Sections 4 13 <br />21 Sedimentation Control Plan - Details and Sections 4 13 <br />22 Sedimentation Control Plan - Details and Sections 4 13 <br />23 Soils and Vegetation Map 2 9 <br />24 General Geologic Cross Section - Cameo No 1 Mine Area 2 6 <br />25 Wildlife Habitat 3 11 <br />26 Roadside Mine Cross Sections 5 14 <br />27 Cameo No. 1 Mine Cross Sections 5 14 <br />28 North Decline Cross Sections 5 14 <br />29 Roadside Mine Subsidence Monitoring Plan 6 20 <br />30 Roadside Mine Subsidence Monitoring Plan 6 20 <br />31 Cameo “B” Seam Isopach 2 6 <br />32 Cameo “B” Seam Overburden 2 6 <br />33 Alluvial Valley Floor Reconnaissance Survey 6 21 <br />33-1 Irrigated Fields 10-14-76 6 21 <br />33-2 Potentially Irrigated Fields 11-16-94 6 21 <br />39 Surface Geology 2 6 <br />40 General Geologic Cross Section Roadside Mine Area 2 6 <br />41 Structural Contour Map - Top of Cameo “B” Seam 2 6 <br />42 Cameo “B” Seam Isopach 2 6 <br /> <br />TR-71 REV 03/22 <br />