Laserfiche WebLink
ix <br /> <br />17-2 5 Salinity Report <br />18-1 5 BLM Consent for Monitoring on Jerry Creek and Coal Canyon <br />20-1 6 Protective Pillar Design for Ute Water Property <br />20-2 6 Angle of Draw Observations <br />20-3 6 Pillar Design Analysis <br />20-4 6 Subsidence Prediction <br />20-5 6 Colorado Ute Transmission Line Subsidence Predictions <br />20-6 6 Colorado Ute Notice to Proceed with Transmission Line Construction <br />20-7 6 Public Service of Colorado Transmission Line Reservations <br />20-8 6 Consequences of Subsidence on Powerlines <br />20-9 6 TransColorado Gas Transmission Company Letter Agreement <br />20-10 6 Division’s Approval to Suspend Monitoring <br />21-1 6 Colorado Division of Mines Production Records January thru July 1977 <br />21-2 6 Assessment of Alluvial Valley Floor Issues Unit Train Loadout Site <br />21-3 6 Reconnaissance Level Alluvial Valley Floor Investigation of the Rapid & <br />Cottonwood Creek Area <br />21-4 6 Reconnaissance Level Alluvial Valley Floor Investigation -Powderhorn Mine <br /> & Adjacent Area <br /> <br />21-5 6 Stream Flow Water Yield for Irrigation <br />21-6 6 First Amended and Restated Agreement Between General Exploration Company <br />& Mississippi Power Company <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />TR-71 REV 03/22 <br /> <br />