My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-12-09_PERMIT FILE - M2022001 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2022001
>
2022-12-09_PERMIT FILE - M2022001 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 8:39:53 PM
Creation date
12/12/2022 8:27:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2022001
IBM Index Class Name
Permit File
Doc Date
12/9/2022
Doc Name Note
6th Response
Doc Name
Adequacy Review Response
From
Civil Resources, LTD
To
DRMS
Email Name
PSH
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIVIL RESIVURCES, LLC <br /> ENGINEERS & PLANNERS <br /> MEMORANDUM <br /> TO: Robert Lembke <br /> Red Tierra Project File—Section 20 Gravel Mine <br /> FROM: Civil Resources, LLC <br /> DATE: October 14, 2022 <br /> RE: Modifications to Model in Response to DRMS Comments <br /> This memorandum summarizes the modifications to the Section 20 Groundwater Model Report dated August 2022 in response <br /> to a Division of Reclamation Mining and Safety (DRMS) comment that the Monarch DENM Gravel Mine, west of the site, be <br /> included in the Section 20 groundwater model (Adequacy Review dated September 12, 2022). Model modifications include: <br /> ➢ Added the Monarch DENM Gravel Mine slurry walls to the mitigation scenarios. <br /> ➢ An underdrain was included on the Monarch DENM Site. <br /> ➢ Due to the additional obstruction,the eastern mitigation system of an underdrain or dewatering wells pumping 2.5-3.25 <br /> cfs was modeled to be constructed at the same time as the Cell 4 slurry wall rather than during the construction of the <br /> Cell 5N slurry wall. <br /> ➢ Approximately 1,900 feet of underdrain was modeled to be constructed at the same time as the Cell 6 slurry wall to run <br /> between the Cell 6 slurry wall and Weld County Road 42. This drain was sized to remove 3.3 cfs from the model via <br /> discharge to the river which will require coordination with the Monarch DENM ownership group. <br /> The recommendations presented in the August 2022 report mitigated the groundwater mounding modeled to occur with full <br /> build-out of Section 20 slurry walls and the related rise in groundwater in the area of the Town of Gilcrest east of the Section 20 <br /> Site. The addition of the Monarch DENM resulted in further obstruction of groundwater flow around the west side of Section 20 <br /> resulting in additional regional mounding that requires a second underdrain system that conveys the flow to the river and limits <br /> the upstream groundwater rise via a westward draining underdrain beginning near the southwest comer of the Section 20 Site <br /> and carrying approximately 3.3 cfs to the South Platte River(approximately 1,900 feet long). <br /> Attachments: <br /> - DRMS Response Letter <br /> - Revised Groundwater Model Report <br /> JIUnited Water&San-1411Sechon 201DRMSIGroundwate6MEMO Groundwater Model Modifications docx <br /> 8308 COLORAD❑ SLVD, SUITE 200 0 FIRESTONE, COLORADO SOSO4 9 PHONE: 303.833. 1 41 6 <br />