My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-12-05_REVISION - M1994027
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1994027
>
2022-12-05_REVISION - M1994027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2022 8:36:21 PM
Creation date
12/6/2022 7:51:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994027
IBM Index Class Name
Revision
Doc Date
12/5/2022
Doc Name
Request for Technical Revision
From
Holcim
To
DRMS
Type & Sequence
TR3
Email Name
PSH
JLE
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A'GG TR-3 <br /> nHOLCIM <br /> ``�`O PSH/JLE <br /> � ��c <br /> 1�oN <br /> 0 <br /> S\oNo�PNO '(`l <br /> November 30, 2022 <br /> Mr. Peter Hays <br /> Environmental Protection Specialist <br /> Division of Reclamation, Mining and Safety <br /> 1313 Sherman Street, Room 215 <br /> Denver, CO 80203 <br /> Re: Permit No. M-1994-027— Longmont Operation <br /> Technical Revision Request—Reclamation Plan <br /> Dear Mr. Hays: <br /> Holcim—WCR, Inc. (Holcim) submits this letter and the documents referenced herein as a <br /> technical revision to the reclamation plan. A check in the amount of$216 is also enclosed for <br /> the required technical revision fee. <br /> Reclamation Plan Revision <br /> Current reclamation plans (Exhibit F) include two open water bodies to be created following <br /> mining activities with optional slurry walls. Revisions following negotiations with the City of <br /> Longmont (the "Lessor") and Aggregate Industries—WCR, Inc. (d/b/a Holcim—WCR, Inc., the <br /> "Lessee") will now include the following: <br /> • Concurrent with and following cessation of mining activities, excavated areas will be <br /> backfilled. <br /> • Backfill material shall consist of either: <br /> o Native material excavated from the mining site, such as process fines, <br /> overburden topsoils, and/or interburden clays, or; <br /> o Imported inert structural fill materials, including but not limited to earth, sand, <br /> gravel, rock, hardened concrete, masonry, and/or other inert solids meeting the <br /> DRMS definition of'Inert Materials'. <br /> • Excavated areas will be backfilled to between: <br /> o A minimum height matching the maximum known pre-mining groundwater <br /> elevation, and; <br /> Holcim US,1687 Cole Blvd.,Suite 300,Golden,CO 80401 <br /> Phone 303-985-1070,www.hoicim.com 1/2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.