Laserfiche WebLink
I've got a Plan of Ops that proposes to construct a water pipeline at the above location.The operator says the <br /> pipeline crosses USFS lands; however, all our records disagree.The mill/mine don't intersect USFS lands. <br /> Attached are the MTPs for the area and maps. I've also provided a kmz of the pipeline.The surface layer in this <br /> area is a cluster b/c of all the historic mining, so I wanted to double check with you before responding to the <br /> operator. <br /> Also, if the pipeline crosses USFS lands, what process does the operator need to do for compliance with the <br /> USFS? Does BLM just include the FS in the NEPA process as a cooperating agency or does the operator need to <br /> file a separate ROW application and go through a separate NEPA process with y'all? <br /> Thanks for the input and help!I I <br /> Legend <br /> Pink=water pipeline <br /> Blue= mill & mine boundary <br /> Yellow= BLM lands <br /> Green = USFS lands <br /> Vertical Lines =fed min estate <br /> 9 <br />