Laserfiche WebLink
Mobilization Worksheet Cont'd Task#JO1 Page 2 of 2 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: BRIGHTON <br /> Total one-way travel distance: 20.00 miles <br /> Average Travel Speed: 50.00 mph <br /> Total Non-Roadable Mob/Demob Cost* $20,800.33 <br /> `*two round trips with haul rig: <br /> Total Roadable Mob/Demob Cost** <br /> ** one round trip,no haul rig: $264.91 <br /> Transportation Cycle Time: <br /> Non- <br /> Roadable Roadable <br /> Equipment Equipment <br /> Haul Time(Hours): 0.40 0.40 <br /> Return Time(Hours): 0.40 0.40 <br /> Loading Time(Hours): 3.50 NA <br /> Unloading Time(Hours): 3.50 NA <br /> Subtotals: 7.80 0.80 <br /> JOB TIME AND COST <br /> Total job time: 15.60 Hours <br /> Total job cost: 521,065 <br /> CIRCES Cost Estimating Software <br />