My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-12-01_REVISION - C1981028 (9)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981028
>
2022-12-01_REVISION - C1981028 (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2022 8:39:25 AM
Creation date
12/1/2022 10:35:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
Revision
Doc Date
12/1/2022
Doc Name Note
Findings & Cost Estimate
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Coors Energy Company
Type & Sequence
SL11
Email Name
RDZ
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck/Loader Worksheet Cont'd Task# I01 Page 4 of 4 <br /> Haul Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> (min) <br /> 1 3400.00 1.00 3.00 4.00 2665 1.439 <br /> Haul Time: 1.439 minutes <br /> Return Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 3400.00 -1.00 3.00 2.00 2905 1.205 <br /> Return Time: 1.205 minutes <br /> Total Truck Cycle Time: 5.548 minutes <br /> Loading Tool unit <br /> Production 425.03 LCY/Hour Adjusted for job efficiency: 352.77 LCY/Hour <br /> Truck Unit Production <br /> 153.53 LCY/Hour Adjusted for job efficiency: 127.43 LCY/Hour <br /> Optimal No. of Trucks: 3 Tmck(s) Selected Number of Trucks: 3 Tmck(s) <br /> Adjusted hourly truck team production: 382.28 LCY/Hour <br /> Adjusted single truck/loader team production: 352.77 LCY/Hour <br /> Adjusted multiple truck/loader team production: 352.77 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 1.38 Hours <br /> Unit cost: $1.928 /LCY Total job cost: $937 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.