Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task# I01 Page 4 of 4 <br /> Haul Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> (min) <br /> 1 3400.00 1.00 3.00 4.00 2665 1.439 <br /> Haul Time: 1.439 minutes <br /> Return Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 3400.00 -1.00 3.00 2.00 2905 1.205 <br /> Return Time: 1.205 minutes <br /> Total Truck Cycle Time: 5.548 minutes <br /> Loading Tool unit <br /> Production 425.03 LCY/Hour Adjusted for job efficiency: 352.77 LCY/Hour <br /> Truck Unit Production <br /> 153.53 LCY/Hour Adjusted for job efficiency: 127.43 LCY/Hour <br /> Optimal No. of Trucks: 3 Tmck(s) Selected Number of Trucks: 3 Tmck(s) <br /> Adjusted hourly truck team production: 382.28 LCY/Hour <br /> Adjusted single truck/loader team production: 352.77 LCY/Hour <br /> Adjusted multiple truck/loader team production: 352.77 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 1.38 Hours <br /> Unit cost: $1.928 /LCY Total job cost: $937 <br /> CIRCES Cost Estimating Software <br />