Laserfiche WebLink
L PROCEDURES AND SUMMARY OF THE REVIEW PROCESS <br /> BRL applied for bond release under the Colorado Surface Coal Mining and Reclamation Act following <br /> reclamation of the Bowie No. I Mine. The mine is located in Delta County, in all or portions of the <br /> following: <br /> • Township 13 South, Range 92 West of the 6th P.M. <br /> o Section 1: SW'/4 <br /> o Section 2: SE'/4 <br /> o Section 10: Lots 1-3, 6-11, 13, 14-16,El/z Lot 13 <br /> o Section 11: All <br /> o Section 12: Lots 3-6, 11-15, SW'/4SW'/4 <br /> o Section 13: All <br /> o Section 14: All <br /> o Section 15: Lots 1-3,6-11, 14-16, 17-22 <br /> o Section 22: Lots 1-3,6-8 <br /> o Section 23: Lots 1-8 (N'/2),Parcel 7 and a portion of Parcel 9 <br /> o Section 24: Lots 1-6, 8, 9, 11, 12, eastern portion of Lot 10,western portion of Lots 7 <br /> & 13, S'/2NE'/4,NW'/4SE'/4 <br /> o Section 25: Parcels 1, 2,3 and 8. <br /> • Township 13 South,Range 91 West of the 6th P.M. <br /> o Section 17: SW'/4 <br /> o Section 18: Lots 3-4,E'/2SW'/4,W'/2SE'/4.NE'/4SE'/4,NW'/4SE'/4SE'/4 <br /> o Section 19:NE'/4NW'/4,N'/2NW'/4NE'/4 <br /> o Section 29: A portion of Parcel 6 <br /> o Section 30: Parcels 4, 5 and a portion of Parcel 10 <br /> o Section 31: A portion of Parcel 10 <br /> o Section 32: A portion of Parcel 10. <br /> Bond release application SL-01 for the Bowie No. I Mine was submitted on March 19,2001. The SL- <br /> 01 bond release requested Phase I bond release on 14.9 disturbed acres associated with the West Mine <br /> Portal and fill, and 2.0 disturbed acres associated with the fan site and access road. The Division <br /> received a request for withdraw of the SL-0I application on July 1,2002,and the Division approved the <br /> withdraw request on July 10,2002. <br /> BRL bond release application SL-02 for the Bowie No. I Mine was submitted on September 26,2002 <br /> and found complete on November 18,2002. SL-2 originally requested Phase I bond release on 16.4 <br /> reclaimed acres of backfilling and grading at the West Mine and structural demolition at the East and <br /> West Mines. During the review process of SL-02,the size of the backfilled and graded areas associated <br /> with the West Mine was reduced from 16.4 acres to 13.1 acres. SL-02 was approved on August 10, <br /> 2004,which approved the release of$1,143,807.00 in liability. <br /> The SL-03 bond release application for the Bowie No. I Mine was received by the Division on June 28, <br /> 2007,and found complete on August 9,2007. BRL initially requested the Phase I release for the <br /> structural demolition and removal of facilities located at the Bowie No. 1 Train Loadout. On March 31, <br /> Pennit Number C-1981-038 Page 3 of 12 <br />