Laserfiche WebLink
inCOLORADO <br /> a Division of Reclamation, <br /> ® Mining and Safety <br /> Department of Natural Resources <br /> 1313 Sherman St. Room 215 <br /> Denver, CO 80203 <br /> November 21, 2022 <br /> Sarah Vance <br /> GCC Energy, LLC <br /> PO Box 100 <br /> Tijeras,NM 87123 <br /> Re: Proposed Decision <br /> Permit Renewal Application No. 8(RN-8) <br /> King Coal Mine(Permit No.C-1981-035) <br /> Dear Ms. Vance: <br /> Enclosed you will find the Division of Reclamation,Mining and Safety's Proposed Decision Package <br /> for Permit Renewal No. 8 at the King Coal Mine. Notice of the proposed decision will be published <br /> in the Durango Herald as soon as possible. The thirty (30) day public comment period for the <br /> Division's decision will begin on the day following the first publication. <br /> Documentation must be submitted to the Division demonstrating that a copy of the approved renewal <br /> materials were sent to the Office of Surface Mining and the Bureau of Land Management. The <br /> materials should be sent within 15 days of final approval. <br /> Please refer to the Performance Bond heading on the enclosed proposed decision form. If the amount <br /> of Bond Held equals or exceeds the Revised Liability, you need not submit additional bond. <br /> However, if the Revised Liability exceeds the Bond Held,please submit additional bond or rider to <br /> your existing bond that equals or exceeds the Revised Liability. The permit will not be issued until <br /> the Division has received and approved the bond. <br /> If there are stipulations attached,please sign and return the proposed decision form to the Division. <br /> 1313 Sherman St, Room 215 Denver, CO 80203 P (303)866-3567 F(303)832-8106 https://drms.cotorado.gov - <br /> Jared Polis, Governor I Dan Gibbs, Executive Director I Virginia Brannon, Director \jK ,* <br /> \ CIA?f <br />