My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-11-22_REVISION - M2015030 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2015030
>
2022-11-22_REVISION - M2015030 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2022 8:37:52 PM
Creation date
11/28/2022 10:08:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2015030
IBM Index Class Name
Revision
Doc Date
11/22/2022
Doc Name
Request For Amendment To Permit
From
Asphalt Specialties CO
To
DRMS
Type & Sequence
AM2
Email Name
ECS
MAC
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chavers Mining Resource <br /> DRMS Permit No.M-2015-030 <br /> Amendment No.2(AM-02) <br /> November 2022 <br /> Page 15 <br /> 6.4.7 EXHIBIT G - WATER INFORMATION <br /> 6.4.7(1) IF OPERATION IS NOT EXPECTED TO DIRECTLY AFFECT SURFACE OR <br /> GROUNDWATER <br /> Not applicable. <br /> 6.4.7(2) IF OPERATION IS EXPECTED TO DIRECTLY AFFECT SURFACE OR <br /> GROUNDWATER <br /> 6.4.7(2)(a) Surface Water and Groundwater Systems Affected by Operation <br /> With this Amendment (AM-02), no change will occur to the surface water and groundwater <br /> systems directly affected previously identified. Operations at the Chavers Mining Resource affect <br /> surface water associated with the South Platte River located to the west of the mine and <br /> groundwater associated with the South Platte River alluvial aquifer(i.e.,uppermost aquifer). <br /> 6.4.7(2)(b) Known Aquifers <br /> South Platte River alluvial aquifer(unnamed aquifer). <br /> 6.4.7(2)(c) Dewatering Operations and Runoff <br /> Mine process water, which includes groundwater from the dewatering operations and stormwater <br /> that collects in the mine pit, is directed into a settling basin within the pit to allow fine sediments <br /> to settle out before being pumped for discharge to the South Platte River. ASCI will maintain a <br /> topography at the Site to direct stormwater runoff from disturbed areas, piled material, and <br /> operating surfaces that is not collected in the mine pit to areas within the permit boundary where <br /> the water can percolate into the ground. <br /> 6.4.7(3) PROJECT WATER REQUIREMENTS <br /> ASCI submits SWSPs annually to the Colorado Division of Water Resources(DWR)for approval <br /> to refine the estimated project water requirements each year based upon the anticipated site <br /> conditions as mining and/or reclamation progresses.The current approved SWSP estimates project <br /> water requirements will be 51.20 acre-feet over the 12-month period covered by the plan (August <br /> 2022 to July 2023). <br /> 6.4.7(4) REPLACEMENT WATER SOURCES <br /> ASCI utilizes a long-standing relationship with the City of Aurora to supply the project water <br /> requirements. Currently,ASCI holds a water lease with the City of Aurora to supply replacement <br /> water for the Site from 2022 through 2026. ASCI will continue to utilize this relationship <br /> throughout mining and reclamation of the mine. <br />
The URL can be used to link to this page
Your browser does not support the video tag.