Laserfiche WebLink
a <br /> Chavers Mining Resource <br /> DRMS Permit No.M-2015-030 <br /> Amendment No.2(AM-02) <br /> November 2022 <br /> Page 13 <br /> Reclamation Activity Location Size Approximate Time Until <br /> Complete <br /> Cell 2 8 acres <br /> Cell 3 32 acres <br /> Reclamation Phase 1: Cell 4 23 acres 13 years(in 2035) <br /> Backfill <br /> Cell 5 4 acres <br /> Cell 6 4 acres <br /> Cell 1 4 acres <br /> Cell 2 8 acres <br /> Reclamation Phase 2: Cell 3 32 acres <br /> Grading,Topsoil, Seeding, 18 Years(in 2040) <br /> and Growth Monitoring Cell 23 acres <br /> Cell 5 4 acres <br /> Cell 6 4 acres <br /> 6.4.5 (2)(f) Description of Reclamation Details <br /> (i) Final Grading — Reclamation of affected lands at the Site will be graded to the <br /> approximate topographic elevations prior to mining. The slope gradient is anticipated to <br /> range from 0.1% (minimum) to 1% (maximum). The approximate final contours of the <br /> site are shown on Exhibit F-Reclamation Plan Map (Figure 6). <br /> (ii)Seeding—Information regarding seeding(e.g.,types,mixtures,quantities,and expected <br /> times for seeding) is presented in Section 6.4.5 (2)(d) Revegetation Plan. <br /> (iii)Fertilization—Information regarding fertilization(e.g., type,mixtures, quantities, and <br /> time of application)is presented in Section 6.4.5 (2)(d) Revegetation Plan. <br /> (iv)Revegetation—Information regarding revegetation(e.g.,type of grasses,location,etc.) <br /> is presented in Section 6.4.5 (2)(d)Revegetation Plan. <br /> (v)Topsoil—Approximately six(6)inches of topsoil will be placed across backfilled areas <br /> and re-seeded as part of the Site reclamation. <br />