My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-11-22_REVISION - M2015030 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2015030
>
2022-11-22_REVISION - M2015030 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2022 8:37:52 PM
Creation date
11/28/2022 10:08:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2015030
IBM Index Class Name
Revision
Doc Date
11/22/2022
Doc Name
Request For Amendment To Permit
From
Asphalt Specialties CO
To
DRMS
Type & Sequence
AM2
Email Name
ECS
MAC
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> Chavers Mining Resource <br /> DRMS Permit No.M-2015-030 <br /> Amendment No.2(AM-02) <br /> November 2022 <br /> Page 6 <br /> reasonably possible about the backfill materials received at the Site to ensure that those <br /> materials are free of contaminants. All backfill materials will be inspected upon entry to <br /> the Site and while being unloaded using visual and/or olfactory methods to ensure no <br /> potentially contaminated materials are received. If evidence of possible contamination is <br /> observed, loads will be rejected and will not be allowed to be left on-site by the <br /> contractor. No contaminated materials will be accepted or allowed on-site.Any <br /> asphalt or concrete materials received will continue to be diverted to the recycled <br /> aggregate materials operation at the Site. <br /> ■ Backfilling_Process: After an area of the property has been mined of sand and gravel, <br /> backfilling operations will begin once they can be safely conducted. ASCI will conduct <br /> backfill operations concurrent with mining operations whenever possible. ASCI will not <br /> exceed exposed active mining and backfill pit areas of approximately 20 acres at any one- <br /> time. Backfill material will be imported to the Site with articulated dump trucks and/or <br /> highway dump trucks. The material will be placed and spread in one(1)to two (2)-foot <br /> lifts using haul trucks,bulldozers, excavators, and/or loaders. Compaction will take place <br /> during the filling process, as haul trucks and heavy equipment traverse over the fill. <br /> Temporary excavation slopes and temporary stockpiled material slopes may range from <br /> 1:1 to 3:1 depending on soil conditions in the mine. All slopes will be maintained for site <br /> safety and to minimize material erosion. Areas will be backfilled to a rough grade(i.e., <br /> within approximately 2 - 3 feet of final grade). <br /> ■ Grading and Topsoil: Once the backfill is near rough grade across the Site, the surface <br /> contours will be graded to approximately six(6)inches below the final grade across the <br /> Site. After contour grading is complete,a topsoil cover approximately six(6)inches thick <br /> will be placed on top of the backfill to reach topographic elevations prior to mining(i.e., <br /> final grade). The final grade will control water runoff, erosion, and siltation to protect all <br /> areas outside the mine and allow surface drainage to flow gently as sheet flow to the <br /> northeast, consistent with pre-development drainage. The final grade will allow general <br /> agriculture operations, farm machinery,and livestock to traverse the area. <br /> To ensure grading requirements are met, elevations will be checked periodically by ASCI <br /> during the reclamation process. This will continue until the final grade is achieved with <br /> backfill materials and topsoil cover. A final topography survey will be conducted by <br /> ASCI after topsoil has been placed,but before seeding occurs to ensure that the Site <br /> topography is at pre-mining elevations and sloped for positive drainage. All surveys will <br /> be conducted by aerial drone. The allowable vertical variation will be approximately one <br /> (1) foot given that the final topography will be slightly undulating in areas to mimic the <br /> original landform. Once topography across the Site is within acceptable limits,ASCI will <br /> proceed with the revegetation process. The approximate final contours of the Site are <br /> shown on Exhibit F - Reclamation Plan Map. <br />
The URL can be used to link to this page
Your browser does not support the video tag.