Laserfiche WebLink
the reference area production, then production success is met. If this 3 year average does not <br />meet the production of the reference area, the 5th year is managed in the same way and the <br />average production from at least three of the five years, including the last three years <br />immediately prior to bond release application is calculated and compared to the reference area. <br />This process would continue until the minimum 3 year average of production data met the 3 year <br />production average on the reference area for the same period. More than 3 years of production <br />data may be used to calculate these averages on both the reference area and the reclaimed area, <br />provided that the 3 years preceding bond release application are always included in the average <br />calculations. Like all other reference area comparisons at the New Horizon 2 Mine, the <br />comparisons for prime farmland will be made within the accepted statistical confidence interval. <br />Statistical production data will be used in the calculations to compare the reclaimed prime <br />farmland areas to the reference area. <br />January 2016 (TR -70) 2.06.6-5 <br />