Laserfiche WebLink
<br />Section 2.05.4(2)(d) Page 16 April 2022 (PR-09) <br />and the ERMR-Johnson property, where there is a significant steeper slope in these areas. <br /> <br />11. Topsoil Sampling Plan <br /> <br />Prior to topsoil being seeded it will be sampled to ensure it has correct properties to ensure <br />appropriate vegetative growth will occur. Table 2.05.4(2)(d)-5 below provides the topsoil <br />sampling criteria that will be utilized.