Laserfiche WebLink
Demo Worksheet Cont'd Task#TTT Page 93 of 141 <br /> MISCELLANEOUS TRUCK WORK <br /> Task description: Water truck for dust control <br /> Site: King Coal Mine Permit Action: RN8 Permit/Job#: C1981035 <br /> PROJECT IDENTIFICATION <br /> Task#: 314 State: Colorado Abbreviation: None <br /> Date: 5/9/2022 County: La Plata Filename: C035-314 <br /> User: JHB <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Make and Model: Water Tanker,2,500 Gal. Horsepower: 150 <br /> Attachment 1: Shift Basis: 1 per day <br /> Attachment 2: Weight: 5.25 <br /> Labor Unit 1: Tanker Driver- 1 rear axle (US Tons) <br /> Labor Unit 2: <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $11.70 NA <br /> Operating Cost/Hour: $18.00 100 <br /> Operator Cost/Hour: $21.12 NA <br /> Total Unit Cost/Hour: $50.82 <br /> Total Fleet Cost/Hour: $50.82 <br /> JOB TIME AND COST <br /> Fleet size: 1 Truck(s) Total job time: 240.00 Hours <br /> Unit cost: $50.82 /Hour Total job cost: $12,197 <br /> CIRCES Cost Estimating Software <br />