Laserfiche WebLink
Demo Worksheet Cont'd Task#TTT Page 75 of 141 <br /> Truck Cycle Time: <br /> Truck Exchange Time: 0.50 Minutes Adjusted for site altitude: 0.500 Minutes <br /> Truck Load Time: 1.308 Minutes Adjusted for site altitude: 1.308 Minutes <br /> Truck Maneuver and Dump 0.90 Minutes Adjusted for site altitude: 0.900 Minutes <br /> Time: <br /> Truck Travel(Haul&Return)Time: Road Condition:Rutted dirt,little maintenance, no water,2"tire <br /> penetration 5.0 <br /> Haul Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 490.00 3.00 5.00 8.00 1381 0.397 <br /> Haul Time: 0.397 minutes <br /> Return Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 490.00 -3.00 5.00 2.00 2905 0.204 <br /> Return Time: 0.204 minutes <br /> Total Truck Cycle Time: 3.309 minutes <br /> Loading Tool unit <br /> Production 504.90 LCY/Hour Adjusted for job efficiency: 419.06 LCY/Hour <br /> Truck Unit Production <br /> 275.83 LCY/Hour Adjusted for job efficiency: 228.94 LCY/Hour <br /> Optimal No.of Trucks: 2 Truck(s) Selected Number of Trucks: 2 Truck(s) <br /> Adjusted hourly truck team production: 457.89 LCY/Hour <br /> Adjusted single truck/loader team production: 419.06 LCY/Hour <br /> Adjusted multiple truck/loader team production: 419.06 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 50.64 Hours <br /> Unit cost: $1.034 /LCY Total job cost: $21,937 <br /> CIRCES Cost Estimating Software <br />